Dell B-FCX manual Installation tasks, Installation precautions

Page 26

2 Installation tasks

Installation tasks

Follow the steps listed in Table 15 to install your device. Details for each of these steps are provided on the pages indicated.

TABLE 15

Installation tasks

 

 

 

 

Task

Task

Where to Find More Information

Number

 

 

 

 

 

1

Ensure that the physical environment that will host the

“Preparing the installation site” on

 

device has the proper cabling and ventilation.

page 18

 

 

 

2

Install any required optional modules into the switch.

“Powering on the system” on page 24

 

 

 

3

Install the Dell device on a desktop, in an equipment rack

“Installing the device” on page 19

 

(use provided retainer clips and screws).

 

 

 

 

4

Once the device is physically installed, plug the device into

“Powering on the system” on page 24

 

a nearby power source that adheres to the regulatory

 

 

requirements outlined in this manual.

 

 

 

 

5

Attach a terminal or PC to the Dell device. This will enable

“Attaching a PC or terminal” on page 25

 

you to configure the device through the Command Line

 

 

Interface (CLI).

 

 

 

 

6

No default password is assigned to the CLI. For additional

“Assigning permanent passwords” on

 

access security, assign a password.

page 33

 

 

 

7

Before attaching equipment to the device, you need to

“Configuring IP addresses” on page 35

 

configure an interface IP address to the subnet on which it

 

 

will be located. Initial IP address configuration is

 

 

performed using the CLI with a direct serial connection.

 

 

Subsequent IP address configuration can be performed

 

 

using the Web management interface.

 

 

 

 

8

Once you power on the device and assign IP addresses,

“Configuring IP parameters for devices

 

the system is ready to accept network equipment.

running Layer 3 software” on page 37

 

 

 

9

Test IP connectivity to other devices by pinging them and

“Testing connectivity” on page 43

 

tracing routes.

 

 

 

 

10

Continue configuring the device using the CLI or the Web

PowerConnect B-FCX Series Configuration

 

management interface. You also can use Brocade

Guide

 

Network Advisor to manage the device.

 

 

 

 

11

Secure access to the device.

PowerConnect B-FCX Series Configuration

 

 

Guide

 

 

 

Installation precautions

Follow all precautions when installing a Dell device.

16

PowerConnect B-FCX Switch Hardware Installation Guide

 

53-1002267-01

Image 26
Contents PowerConnect B-FCX Switch Page Contents Checking Network Devices and Testing Connectivity Managing the PowerConnect B-FCX HardwareChapter Troubleshooting PowerConnect B-FCX Switch Hardware Installation Guide Document conventions AudienceSupported hardware and software Text formattingRelated publications Command syntax conventionsCommand Parameters Getting technical help or reporting errors Contacting DellPowerConnect B-FCX Switch Hardware Installation Guide Hardware features Product OverviewPowerConnect B-FCX624s front panel Device Label on required power supply Control featuresHardware features Serial management interface DB9 Console port Hardware features Out-of-band RJ45 management InterfacePowerConnect B-FCX 10/100/1000 BASE-T ports Out-of-band RJ45 management interfaceSlot designations Device SlotInterface Show Media Description SFP interfacesOptional two-port 10 Gbps XFP uplink module Four-port 1 Gbps SFP module status LEDs Optional Four-port 1 Gbps SFP and 10 Gbps SFP+ modulesOptional 10Gbps XFP module is not hot-swappable Condition StatusFour-port 10 Gbps SFP+ module status LEDs Cable specifications for CX4 stacking ports16/10 Gbps Ethernet CX4 stacking ports Port status LEDs Hardware features System status LEDs Power status LEDsSwitch Status StateHardware features Port status LEDs SFP+Power supplies Switch Status RedundancyPower supply unit operation General requirements Package contentsUnpacking the device Follow all precautions when installing a Dell device Installation tasksInstallation precautions Task Where to Find More Information NumberPower precautions General precautionsLifting precautions Installation precautionsPreparing the installation site Preparing the installation siteInstallation location Cabling infrastructureInstalling the device Desktop installationRack mount installation Connecting devices in a stack PowerConnect B-FCX624s and PowerConnect B-FCX648s devicesPowerConnect B-FCX Switch Hardware Installation Guide PowerConnect B-FCX624 and PowerConnect B-FCX648 devices Powering on the system Attaching a PC or terminal Serial cable wiring Installing and replacing a power supply unitWiring map for serial cable As indicated in , some of the wires should not be connectedInstalling and replacing a power supply unit PowerConnect B-FCX Switch Hardware Installation Guide Page PowerConnect B-FCX Switch Hardware Installation Guide Page PowerConnect B-FCX Switch Hardware Installation Guide Checking Network Devices and Testing Connectivity Assigning permanent passwordsAssigning permanent passwords Setting passwordsRecovering from a lost password Enter the following command to set the super user passwordDevices running Layer 2 software Configuring IP addressesSyntax enable password Devices running Layer 3 software Configuring IP addresses Assigning an IP address to an Ethernet portAssigning an IP address to a virtual routing interface Deleting an IP addressSyntax interface loopback num Syntax router-interface ve num Syntax interface ve numCable specifications Connecting network devicesConnectors Connecting to Ethernet or fast Ethernet hubsAutomatic MDI or Mdix detection Connecting to workstations, servers, or routersConnecting a network device to a fiber port Fiber Optic transceiversGigabit Optic Distance Supported for stacking Installing a transceiverAll fiber optic interfaces use Class 1 lasers Cabling a fiber optic transceiver Testing connectivity Testing connectivityCleaning the fiber optic connectors Pinging an IP addressMeaning or Action Testing connectivity Network connection-related LED statesDesired Meaning Troubleshooting network connections Tracing a routeCommand syntax Using Virtual Cable Testing to diagnose a cableConfiguration notes Viewing the results of the cable analysisDefines the fields shown in this output Cable statistics Digital optical monitoringSyntax show cable-diag tdr port-num This Line DisplaysTroubleshooting network connections Displaying the temperature Managing temperature settingsUsing the temperature sensor Managing temperature settings Displaying Syslog messages for temperatureChanging temperature warning and shutdown levels Syntax temperature warning stack-unit valueChanging the shutdown temperature Syntax fan-threshold speed-3 mp lowest value highest valueCommand Removing MAC address entries Displaying PowerConnect B-FCX CPU usageChanging the temperature polling interval Syntax chassis poll-time stack-idvalueReplacing a copper or fiber optic module Hardware maintenance scheduleHardware maintenance schedule Removing a copper or fiber optic moduleReplacing a copper or fiber optic module Cleaning the fiber optic connectorsCabling a fiber optic module Replacing a copper or fiber optic module Environmental considerations Hardware specificationsPhysical dimensions and weight Operating EnvironmentCooling system and fans Hardware specificationsStorage Temperature Storage Humidity Storage Altitude Storage environmentAir Inflow Air outlet Mgmt Pinouts and signalling Serial Console port pinoutsMicrons MHz*km or Cable Type Connector TypeRange meters Hardware specifications Cable length summary Power cordsAC power supply specifications Hardware specifications Installation Diagnosing switch indicatorsPower and cooling problems Troubleshooting chartIn-band access Diagnosing switch indicatorsEurope and Australia Cispr 22 Class a Warning USA FCC CFR 47 Part 15 WarningIndustry Canada statement Japan VcciRussia Japan power cordKorea Class a statementCertifications Regulatory complianceRegulatory compliance Regulatory compliance Vorsicht Devices near the input power connectors Never leave tools inside the chassis Gefahr Device PowerConnect B-FCX Switch Hardware Installation Guide