TROUBLESHOOTING
Problem | Cause | Correction | |||
Automatic transfer switch does | 1. | Generator breaker open. | 1. | Reset generator circuit breaker. | |
|
|
|
| ||
not transfer to generator | 2. | Generator voltage not acceptable. | 2. | Refer to generator manual. | |
|
|
|
|
| |
Automatic transfer switch does | 1. | Service disconnect breaker open. | 1. | Reset service disconnect breaker. | |
2. | Utility voltage not acceptable. | 2. | Wait for utility voltage to return | ||
not transfer to utility | |||||
|
|
| to normal. | ||
|
|
|
| ||
|
|
| |||
Generator is still running after | Engine cool down period. | Engine should stop after 1 minute. | |||
switch transfers to utility power |
|
|
|
| |
Supervised loads (air conditioner, | NC contacts not operating correctly. | Check NC contact for proper | |||
etc.) are not operating when |
|
| operation and/or check control wiring | ||
utility is present |
|
| to external load. | ||
|
|
|
|
|