National Instruments FP-1600, network module quick start Place protective cover on last base

Page 4

DIN Rail Mount

C. Slide into position and lock the rail clip. Be careful not to bend any pins.

D. Repeat for each terminal base, up to nine for each network module in most cases. You can use one or two extender cables (which you can order separately) if your FieldPoint bank is too long for your available space.

E.Place protective cover on last base, and install rail locks at each end.

Panel Mount

D. Repeat for each terminal base, up to nine for each network module in most cases. You can use one or two extender cables (which you can order separately) if your FieldPoint bank is too long for your available space.

E. Place protective cover on last base.

4

Image 4
Contents What You Need to Get Set Up Install the Network ModuleLock rail clip Install the Terminal Bases Place protective cover on last base Install the I/O Modules Connect the Network CablesWire Power to Your FieldPoint System FP-1600 FP-AI-100 FP-AO-200 Connect to Field Devices FP-AI-110Power Up Your FieldPoint System Install the FieldPoint Software Verify the InstallationEthernet as the Type IP address is the address of the FP-1600 on the network Click on Find DevicesSelect File»Save Configure I/O Modules Select File»Save when you are done Where to Go from Here FP-1600 Specifications 11 to 30 VDCMechanical Dimensions Copyright 1999, 2000 National Instruments Corporation