7 Power Up Your FieldPoint System
CAUTION: Terminal bases must be connected to the
Plug in each power supply to your FieldPoint bank. You should see all except the STATUS and PROCESS LEDs flash once, and the POWER LED come on and stay on. After a few seconds, the POWER and READY LEDs should be lit on each I/O module. If this is not the case, refer to your
POWER and READY LEDs Stay Lit
The READY LEDs will not light until an IP address is assigned. Likewise, the STATUS LED will stay lit until an IP address is assigned.
After the hardware is installed, you should verify communication, configure the modules, configure your
9