Cisco Systems UCSEZINFRACHSS manual LEDs, Grid Redundancy

Page 35

Overview

LEDs

Note An n+1 redundant system has either two or three power supplies, which may be in any slot.

Grid Redundancy

The grid redundant configuration is sometimes used when you have two power sources to power a chassis or you require greater than N+1 redundancy. If one source fails (which causes a loss of power to one or two power supplies), the surviving power supplies on the other power circuit continue to provide power to the chassis. A common reason for using grid redundancy is if the rack power distribution is such that power is provided by two PDUs and you want the grid redundancy protection in the case of a PDU failure.

To provide grid redundant (or greater than N+1) protection, the following number of power supplies is recommended:

Four power supplies are recommended if the power configuration for that chassis requires greater than 2500W or if using Cisco UCS Release 1.4(1) and later releases

Two power supplies are recommended if the power configuration for that chassis requires less than 2500W or the system is using Cisco UCS Release 1.3(1) or earlier releases

Note Both grids in a power redundant system should have the same number of power supplies. If your system is configured for grid redundancy, slots 1 and 2 are assigned to grid 1 and slots 3 and 4 are assigned to grid 2. If there are only two power supplies (PS) in the a redundant mode chassis, they should be in slots 1 and 3. Slot and cord connection numbering is shown below.

Figure 11: Power Supply Bay and Connector Numbering

Front

Server Slot 1

Server Slot 3

Server Slot 5

Server Slot 7

PS 1

 

PS 2

 

 

 

Server Slot 2

Server Slot 4

Server Slot 6

Server Slot 8

PS 3

 

PS 4

 

 

 

I/O Module Slot 1

Rear

Fan 1

Fan 5

Connector PS 4

Fan 2

 

Fan 3

Fan 6

Module Slot 2

Fan 7

I/O

 

 

Connector

 

Connector

PS 3

 

PS 2

LEDs

Fan 4

Fan 8

Connector PS 1

279770

LEDs on both the chassis and the modules installed within the chassis identify operational states, both separately and in combination with other LEDs.

Cisco UCS 5108 Server Chassis Installation Guide

OL-20035-05

23

Image 35
Contents First Published June 10 Cisco UCS 5108 Server Chassis Installation GuidePage N T E N T S OL-20035-05 Installation Installing and Removing Components Site Planning and Maintenance Records Viii Text Type Indication AudienceConventions String Documentation Roadmaps Other Documentation Resources Related Cisco UCS DocumentationXii System Overview OverviewFeature Benefit Features and BenefitsFeature Cisco UCS 5108 Server Chassis ComponentsCisco UCS B200 Blade Servers Blade ServersLEDs Cisco UCS B200 M3 Cisco UCS B200 M3 Blade ServersCisco UCS B22 M3 Cisco UCS B22 M3 Blade ServersCisco UCS B230 N20-B6730 Front Panel Cisco UCS B230 Blade ServersOL-20035-05 Cisco UCS B250 Cisco UCS B250 Blade ServersCisco UCS B440 Cisco UCS B440 Blade ServersCisco UCS B420 M3 Cisco UCS B420 M3 High Performance Blade ServerCisco UCS M81KR Virtual Interface Card Adapter CardsCisco UCS Virtual Interface Card Cisco UCS M71KR-E Emulex Converged Network Adapter Cisco UCS 82598KR-CI 10 Gigabit Ethernet AdapterCisco UCS M71KR-Q QLogic Converged Network Adapter Cisco UCS 2104 IO Module Cisco UCS 2104XP FEXesCisco UCS 2208 FEX UCS-IOM-2208XP Cisco UCS 2200 Series FEXesCisco UCS 2204XP FEX Power Distribution Unit PDU Fan Modules Power SuppliesButtons and Connectors Power Supply RedundancyNon-redundant Mode Grid Redundancy LEDsLEDs on a Cisco UCS 5108 Server Chassis-Front View LED LocationsColor Description Interpreting LEDsPower Supply Blade Server LEDs OL-20035-05 Installation Cable Management Rack RequirementsCable Management Airflow ConsiderationsMoving Server Chassis Installation GuidelinesUnpacking and Inspecting the Chassis Required EquipmentAttaching the Round Hole Adapter Optional Attaching the Round Hole Adapter Kit to the Rails OptionalQuantity Part Description Installing the ChassisAdjusting the Tool-less Rack Mount Rail Installing the RailsInstalling Tool-less Chassis Support Rails into the Rack Proper Placement for the Rails and Cage Nuts Left rail Right rail Installing the Round Hole Adapter KitAttaching the Mounting Brackets to a Round Hole Rack Round Hole Adapter and Rails Installed in a Rack Inserting the Chassis into the Rack Mounting Rail Weight Distribution Square Hole Mount ShownSecuring the Chassis Into the Rack Required Tools Connecting a DC Power SupplyDC Power Installation Procedure Procedure Inch holes measuring .625 inches from center to center Port Groups for Fabric Port Channels Cabling Considerations for Fabric Port ChannelsProper FEX and Fabric Interconnect Port Connectivity Fabric Interconnect B Rear Port Removing the Chassis from a Rack Model Description Repacking the ChassisSFP+ Transceivers SFP+ Twinax Copper TransceiversSFP-10G-SR Optical SFP+ TransceiversRemoving a Twinax Copper SFP+ Transceiver OL-20035-05 Installing and Removing Components View of Cisco UCS 5108 Server Chassis Installing and Removing a Blade Server Hard Drive Installing and Removing a Blade ServerInstalling a Blade Server Hard Drive Removing a Blade Server Hard Drive Installing and Removing Power SuppliesPositioning a Power Supply in the Cisco UCS Server Chassis Installing a Power SupplyPower Supply Bay and Connector Numbering AC Version Shown Removing a Power SupplyInstalling a PDU Installing and Removing a Power Distribution Unit PDURemoving a PDU Installing and Removing FEXesFEX Upgrade Considerations Removing a FEX Positioning a 4 Port FEX within the Server Chassis Installing a FEXInstalling a Fan Module Installing and Removing a Fan ModuleRemoving a Fan Module OL-20035-05 KVM Cable Technical SpecificationsDescription Specification Chassis SpecificationsParameter Symbol Min Max Environmental SpecificationsAC-input Gold Power Supply N20-PAC5-2500W Specifications DC-Input Power Supply N20-DC-2500 Specifications Australia and New Zealand Supported AC Power Cords and PlugsIsrael Continental EuropeInternational Locking 200 to 240 VAC Operation Japan and North AmericaNon-Locking 200 to 240 VAC operation Switzerland Peoples Republic of ChinaCAB-ACS-16 Power Cord for the UCS 5108 Blade Server Chassis Task No. Planning Activity Verified By Time Site Preparation ChecklistTask No. Planning Activity Verified By Time Device Serial Number Contact and Site InformationChassis and Module Information Device Serial Number Or B FEX Port Connection RecordConnected to Port Fabric SlotOL-20035-05