Site Planning and Maintenance Records
Site Preparation Checklist
Task No. Planning Activity | Verified By | Time | Date |
2Environmental evaluation:
•Ambient temperature
•Humidity
•Altitude
•Atmospheric contamination
•Air flow
3Power evaluation:
•Input power type
•Power receptacles6
•Receptacle proximity to the equipment
•Dedicated circuit for power supply
•Dedicated (separate) circuits for redundant power supplies
•UPS7 for power failures
4Grounding evaluation:
•Circuit breaker size
•CO ground (AC- powered systems)
5Cable and interface equipment evaluation:
•Cable type
•Connector type
•Cable distance limitations
•Interface equipment (transceivers)
6EMI8 evaluation:
•Distance limitations for signaling
•Site wiring
•RFI9 levels
6Verify that the power supply installed in the chassis has a dedicated AC source circuit.
7 UPS: uninterruptable power supply.