Installing and Removing Components
Installing a FEX
Installing a FEX
Procedure
Step 1 Make sure that the two levers at the front of the FEX are pulled open.
Step 2 Slide the FEX into the chassis slot, ensuring that the FEX is fully seated.
Figure 39: Positioning a 4 Port FEX within the Server Chassis
192601
Figure 40: Positioning an 8 Port FEX within the Server Chassis
237202
Step 3 Close the levers and tighten the captive screw on each lever.
Step 4 Connect the networking cables (see SFP+ Transceivers, on page 51 and Proper FEX and Fabric Interconnect Port Connectivity, on page 48 ).
Step 5 Verify that the I/O Module is functioning correctly. See LED Locations, on page 24 and Interpreting LEDs, on page 25.
Cisco UCS 5108 Server Chassis Installation Guide
65 |