Cisco Systems UCSEZINFRACHSS manual Fabric Interconnect B Rear Port

Page 61

Installation

Proper FEX and Fabric Interconnect Port Connectivity

The following figure shows an invalid connection from a FEX to two separate fabric interconnects.

Figure 28: Invalid Connection for the Server Chassis and two Cisco UCS 6120XP Fabric Interconnects

Fabric Interconnect A Rear

1

3

5

 

7

9

11

13

15

17

19

21

23

25

27

29

31

 

1

3

5

7

9

11

13

15

 

2

4

6

 

8

10

12

14

16

18

20

22

24

26

28

30

32

 

2

4

6

8

10

12

14

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fabric Interconnect B Rear

 

 

 

1

3

5

7

9

11

13

15

17

19

21

23

25

27

29

31

 

1

3

5

7

9

11

13

15

 

 

2

4

6

8

10

12

14

16

18

20

22

24

26

28

30

32

 

2

4

6

8

10

12

14

16

 

 

 

 

 

 

 

Port 1

 

 

 

 

 

 

Port 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Port 2

 

 

 

 

 

 

Port 2

 

 

 

 

 

 

 

 

 

 

 

 

 

Port 3

 

 

 

 

 

Port 3

 

 

 

 

 

 

 

 

 

 

 

Port 4

 

 

 

 

 

Port 4

 

 

 

 

 

 

 

 

I/O Module

Slot 1

 

I/O

Module

Slot 2

 

 

 

 

 

 

 

 

 

 

Chassis 1 rear

192748

Both fabric interconnects should be wired identically: if port 1 on FEX 1 for a chassis goes to FI-A port 5, then port 1 on FEX 2 goes to FI-B port 5.

The following figure shows valid connections from FEXes in two chassis to two separate fabric interconnects. When you connect the server chassis to the fabric interconnect do not connect the FEXes to the fabric interconnect's expansion modules. While similar in appearance to the other

Cisco UCS 5108 Server Chassis Installation Guide

OL-20035-05

49

Image 61
Contents First Published June 10 Cisco UCS 5108 Server Chassis Installation GuidePage N T E N T S OL-20035-05 Installation Installing and Removing Components Site Planning and Maintenance Records Viii Conventions AudienceText Type Indication String Documentation Roadmaps Other Documentation Resources Related Cisco UCS DocumentationXii System Overview OverviewFeature Benefit Features and BenefitsFeature Cisco UCS 5108 Server Chassis ComponentsCisco UCS B200 Blade Servers Blade ServersLEDs Cisco UCS B200 M3 Cisco UCS B200 M3 Blade ServersCisco UCS B22 M3 Cisco UCS B22 M3 Blade ServersCisco UCS B230 N20-B6730 Front Panel Cisco UCS B230 Blade ServersOL-20035-05 Cisco UCS B250 Cisco UCS B250 Blade ServersCisco UCS B440 Cisco UCS B440 Blade ServersCisco UCS B420 M3 Cisco UCS B420 M3 High Performance Blade ServerCisco UCS Virtual Interface Card Adapter CardsCisco UCS M81KR Virtual Interface Card Cisco UCS M71KR-E Emulex Converged Network Adapter Cisco UCS 82598KR-CI 10 Gigabit Ethernet AdapterCisco UCS M71KR-Q QLogic Converged Network Adapter Cisco UCS 2104 IO Module Cisco UCS 2104XP FEXesCisco UCS 2208 FEX UCS-IOM-2208XP Cisco UCS 2200 Series FEXesCisco UCS 2204XP FEX Power Distribution Unit PDU Buttons and Connectors Power SuppliesPower Supply Redundancy Fan ModulesNon-redundant Mode Grid Redundancy LEDsLEDs on a Cisco UCS 5108 Server Chassis-Front View LED LocationsColor Description Interpreting LEDsPower Supply Blade Server LEDs OL-20035-05 Installation Cable Management Rack RequirementsCable Management Airflow ConsiderationsMoving Server Chassis Installation GuidelinesUnpacking and Inspecting the Chassis Required EquipmentAttaching the Round Hole Adapter Optional Attaching the Round Hole Adapter Kit to the Rails OptionalQuantity Part Description Installing the ChassisAdjusting the Tool-less Rack Mount Rail Installing the RailsInstalling Tool-less Chassis Support Rails into the Rack Proper Placement for the Rails and Cage Nuts Left rail Right rail Installing the Round Hole Adapter KitAttaching the Mounting Brackets to a Round Hole Rack Round Hole Adapter and Rails Installed in a Rack Inserting the Chassis into the Rack Mounting Rail Weight Distribution Square Hole Mount ShownSecuring the Chassis Into the Rack DC Power Installation Procedure Connecting a DC Power SupplyRequired Tools Procedure Inch holes measuring .625 inches from center to center Port Groups for Fabric Port Channels Cabling Considerations for Fabric Port ChannelsProper FEX and Fabric Interconnect Port Connectivity Fabric Interconnect B Rear Port Removing the Chassis from a Rack SFP+ Transceivers Repacking the ChassisSFP+ Twinax Copper Transceivers Model DescriptionSFP-10G-SR Optical SFP+ TransceiversRemoving a Twinax Copper SFP+ Transceiver OL-20035-05 Installing and Removing Components View of Cisco UCS 5108 Server Chassis Installing and Removing a Blade Server Hard Drive Installing and Removing a Blade ServerInstalling a Blade Server Hard Drive Removing a Blade Server Hard Drive Installing and Removing Power SuppliesPositioning a Power Supply in the Cisco UCS Server Chassis Installing a Power SupplyPower Supply Bay and Connector Numbering AC Version Shown Removing a Power SupplyInstalling a PDU Installing and Removing a Power Distribution Unit PDUFEX Upgrade Considerations Installing and Removing FEXesRemoving a PDU Removing a FEX Positioning a 4 Port FEX within the Server Chassis Installing a FEXInstalling a Fan Module Installing and Removing a Fan ModuleRemoving a Fan Module OL-20035-05 KVM Cable Technical SpecificationsDescription Specification Chassis SpecificationsParameter Symbol Min Max Environmental SpecificationsAC-input Gold Power Supply N20-PAC5-2500W Specifications DC-Input Power Supply N20-DC-2500 Specifications Australia and New Zealand Supported AC Power Cords and PlugsInternational Continental EuropeIsrael Non-Locking 200 to 240 VAC operation Japan and North AmericaLocking 200 to 240 VAC Operation Switzerland Peoples Republic of ChinaCAB-ACS-16 Power Cord for the UCS 5108 Blade Server Chassis Task No. Planning Activity Verified By Time Site Preparation ChecklistTask No. Planning Activity Verified By Time Chassis and Module Information Contact and Site InformationDevice Serial Number Device Serial Number Connected to FEX Port Connection RecordPort Fabric Slot Or BOL-20035-05