Cisco Systems UCSEZINFRACHSS manual Cisco UCS B200 M3 Blade Servers

Page 19

Overview

Blade Servers

Cisco UCS B200 M3 Blade Servers

For full service and installation instructions, see the Cisco UCS B200 M3 Blade Server Installation and Service Note. You can install up to eight UCS B200 M3 Blade Servers to a chassis.

Figure 2: Cisco UCS B200 M3

1

Asset Tag 1

7

Network link status LED

2

Blade ejector handle

8

Blade health LED

3

Ejector captive screw

9

Console connector

4

Hard drive bay 1

10

Reset button access

5

Hard drive bay 2

11

Beaconing LED and button

6Power button and LED

1 Each server has a blank plastic tag that pulls out of the front panel which is provided so that you can add your own asset tracking label without interfering with the intended air flow.

LEDs

The LED indicators indicate whether the blade server is in active or standby mode, the status of the network link, the over all health of the blade server, and whether the server is set to give a flashing blue beaconing indication. See Interpreting LEDs, on page 25 for details.

The removable hard disks also have LEDs indicating hard disk access activity and hard disk health.

Buttons

The Reset button is just inside the chassis and must be pressed using the tip of a paper clip or a similar item. Hold the button down for five seconds and then release it to restart the server if other methods of restarting are not working.

The beaconing function for an individual server may get turned on or off by pressing the combination button and LED. See Interpreting LEDs, on page 25 for details.

Cisco UCS 5108 Server Chassis Installation Guide

OL-20035-05

7

Image 19
Contents First Published June 10 Cisco UCS 5108 Server Chassis Installation GuidePage N T E N T S OL-20035-05 Installation Installing and Removing Components Site Planning and Maintenance Records Viii Conventions AudienceText Type Indication String Documentation Roadmaps Other Documentation Resources Related Cisco UCS DocumentationXii System Overview OverviewFeature Benefit Features and BenefitsFeature Cisco UCS 5108 Server Chassis ComponentsCisco UCS B200 Blade Servers Blade ServersLEDs Cisco UCS B200 M3 Cisco UCS B200 M3 Blade ServersCisco UCS B22 M3 Cisco UCS B22 M3 Blade ServersCisco UCS B230 N20-B6730 Front Panel Cisco UCS B230 Blade ServersOL-20035-05 Cisco UCS B250 Cisco UCS B250 Blade ServersCisco UCS B440 Cisco UCS B440 Blade ServersCisco UCS B420 M3 Cisco UCS B420 M3 High Performance Blade ServerCisco UCS Virtual Interface Card Adapter CardsCisco UCS M81KR Virtual Interface Card Cisco UCS M71KR-E Emulex Converged Network Adapter Cisco UCS 82598KR-CI 10 Gigabit Ethernet AdapterCisco UCS M71KR-Q QLogic Converged Network Adapter Cisco UCS 2104 IO Module Cisco UCS 2104XP FEXesCisco UCS 2208 FEX UCS-IOM-2208XP Cisco UCS 2200 Series FEXesCisco UCS 2204XP FEX Power Distribution Unit PDU Fan Modules Power SuppliesButtons and Connectors Power Supply RedundancyNon-redundant Mode Grid Redundancy LEDsLEDs on a Cisco UCS 5108 Server Chassis-Front View LED LocationsColor Description Interpreting LEDsPower Supply Blade Server LEDs OL-20035-05 Installation Cable Management Rack RequirementsCable Management Airflow ConsiderationsMoving Server Chassis Installation GuidelinesUnpacking and Inspecting the Chassis Required EquipmentAttaching the Round Hole Adapter Optional Attaching the Round Hole Adapter Kit to the Rails OptionalQuantity Part Description Installing the ChassisAdjusting the Tool-less Rack Mount Rail Installing the RailsInstalling Tool-less Chassis Support Rails into the Rack Proper Placement for the Rails and Cage Nuts Left rail Right rail Installing the Round Hole Adapter KitAttaching the Mounting Brackets to a Round Hole Rack Round Hole Adapter and Rails Installed in a Rack Inserting the Chassis into the Rack Mounting Rail Weight Distribution Square Hole Mount ShownSecuring the Chassis Into the Rack DC Power Installation Procedure Connecting a DC Power SupplyRequired Tools Procedure Inch holes measuring .625 inches from center to center Port Groups for Fabric Port Channels Cabling Considerations for Fabric Port ChannelsProper FEX and Fabric Interconnect Port Connectivity Fabric Interconnect B Rear Port Removing the Chassis from a Rack Model Description Repacking the ChassisSFP+ Transceivers SFP+ Twinax Copper TransceiversSFP-10G-SR Optical SFP+ TransceiversRemoving a Twinax Copper SFP+ Transceiver OL-20035-05 Installing and Removing Components View of Cisco UCS 5108 Server Chassis Installing and Removing a Blade Server Hard Drive Installing and Removing a Blade ServerInstalling a Blade Server Hard Drive Removing a Blade Server Hard Drive Installing and Removing Power SuppliesPositioning a Power Supply in the Cisco UCS Server Chassis Installing a Power SupplyPower Supply Bay and Connector Numbering AC Version Shown Removing a Power SupplyInstalling a PDU Installing and Removing a Power Distribution Unit PDUFEX Upgrade Considerations Installing and Removing FEXesRemoving a PDU Removing a FEX Positioning a 4 Port FEX within the Server Chassis Installing a FEXInstalling a Fan Module Installing and Removing a Fan ModuleRemoving a Fan Module OL-20035-05 KVM Cable Technical SpecificationsDescription Specification Chassis SpecificationsParameter Symbol Min Max Environmental SpecificationsAC-input Gold Power Supply N20-PAC5-2500W Specifications DC-Input Power Supply N20-DC-2500 Specifications Australia and New Zealand Supported AC Power Cords and PlugsInternational Continental EuropeIsrael Non-Locking 200 to 240 VAC operation Japan and North AmericaLocking 200 to 240 VAC Operation Switzerland Peoples Republic of ChinaCAB-ACS-16 Power Cord for the UCS 5108 Blade Server Chassis Task No. Planning Activity Verified By Time Site Preparation ChecklistTask No. Planning Activity Verified By Time Chassis and Module Information Contact and Site InformationDevice Serial Number Device Serial Number Or B FEX Port Connection RecordConnected to Port Fabric SlotOL-20035-05