Installation

Connecting a DC Power Supply

Note Both grids in a power redundant system should have the same number of power supplies. If your system is configured for grid redundancy, slots 1 and 2 are assigned to grid 1 and slots 3 and 4 are assigned to grid 2. If only two power supplies (PS) are in a redundant- mode chassis, they should be in slots 1 and 3. Slot and cord connection numbering is shown below.

Figure 25: Power Supply Bay and Connector Numbering

Front

Server Slot 1

Server Slot 3

Server Slot 5

Server Slot 7

PS 1

 

PS 2

 

 

 

Server Slot 2

Server Slot 4

Server Slot 6

Server Slot 8

PS 3

 

PS 4

 

 

 

 

 

Fan 1

Fan 2

 

 

 

Fan 3

Fan 4

 

Module Slot 1

 

 

Module Slot 2

 

 

 

 

 

 

 

 

 

 

 

 

Fan 5

Fan 6

 

 

Fan 7

Fan 8

 

I/O

I/O

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Connector

Connector

 

Connector

Connector

Rear

 

PS 4

PS 3

 

PS 2

PS 1

 

 

 

 

 

 

 

 

279770

Step 6 Connect the server chassis to the fabric interconnect as described in Proper FEX and Fabric Interconnect Port Connectivity, on page 48.

Connecting a DC Power Supply

This section describes how to connect power to the rear PDU terminals on the DC version chassis (UCSB-5108-DC) corresponding to a UCS 5108 DC power supply (UCSB-PSU-2500DC48).

Required Tools

You must have the following tools to perform this procedure:

A Phillips screwdriver

A 10-mm wrench or socket

Connectors and wire for the DC circuit or circuits

DC Power Installation Procedure

Warning When stranded wiring is required, use approved wiring terminations, such as closed-loop or spade-type with upturned lugs. These terminations should be the appropriate size for the wires and should clamp both the insulation and conductor. Statement 1002

Warning Before performing any of the following procedures, ensure that power is removed from the DC circuit. Statement 1003

Cisco UCS 5108 Server Chassis Installation Guide

44

OL-20035-05

Image 56
Contents Cisco UCS 5108 Server Chassis Installation Guide First Published June 10Page N T E N T S OL-20035-05 Installation Installing and Removing Components Site Planning and Maintenance Records Viii Text Type Indication AudienceConventions String Related Cisco UCS Documentation Documentation Roadmaps Other Documentation ResourcesXii Overview System OverviewFeatures and Benefits Feature BenefitFeature Components Cisco UCS 5108 Server ChassisBlade Servers Cisco UCS B200 Blade ServersLEDs Cisco UCS B200 M3 Blade Servers Cisco UCS B200 M3Cisco UCS B22 M3 Blade Servers Cisco UCS B22 M3Cisco UCS B230 Blade Servers Cisco UCS B230 N20-B6730 Front PanelOL-20035-05 Cisco UCS B250 Blade Servers Cisco UCS B250Cisco UCS B440 Blade Servers Cisco UCS B440Cisco UCS B420 M3 High Performance Blade Server Cisco UCS B420 M3Cisco UCS M81KR Virtual Interface Card Adapter CardsCisco UCS Virtual Interface Card Cisco UCS 82598KR-CI 10 Gigabit Ethernet Adapter Cisco UCS M71KR-E Emulex Converged Network AdapterCisco UCS M71KR-Q QLogic Converged Network Adapter Cisco UCS 2104XP FEXes Cisco UCS 2104 IO ModuleCisco UCS 2200 Series FEXes Cisco UCS 2208 FEX UCS-IOM-2208XPCisco UCS 2204XP FEX Power Distribution Unit PDU Power Supplies Buttons and ConnectorsPower Supply Redundancy Fan ModulesNon-redundant Mode LEDs Grid RedundancyLED Locations LEDs on a Cisco UCS 5108 Server Chassis-Front ViewInterpreting LEDs Color DescriptionPower Supply Blade Server LEDs OL-20035-05 Installation Rack Requirements Cable ManagementAirflow Considerations Cable ManagementInstallation Guidelines Moving Server ChassisRequired Equipment Unpacking and Inspecting the ChassisAttaching the Round Hole Adapter Kit to the Rails Optional Attaching the Round Hole Adapter OptionalInstalling the Chassis Quantity Part DescriptionInstalling the Rails Adjusting the Tool-less Rack Mount RailInstalling Tool-less Chassis Support Rails into the Rack Proper Placement for the Rails and Cage Nuts Installing the Round Hole Adapter Kit Left rail Right railAttaching the Mounting Brackets to a Round Hole Rack Round Hole Adapter and Rails Installed in a Rack Mounting Rail Weight Distribution Square Hole Mount Shown Inserting the Chassis into the RackSecuring the Chassis Into the Rack Required Tools Connecting a DC Power SupplyDC Power Installation Procedure Procedure Inch holes measuring .625 inches from center to center Cabling Considerations for Fabric Port Channels Port Groups for Fabric Port ChannelsProper FEX and Fabric Interconnect Port Connectivity Fabric Interconnect B Rear Port Removing the Chassis from a Rack Repacking the Chassis SFP+ TransceiversSFP+ Twinax Copper Transceivers Model DescriptionOptical SFP+ Transceivers SFP-10G-SRRemoving a Twinax Copper SFP+ Transceiver OL-20035-05 Installing and Removing Components View of Cisco UCS 5108 Server Chassis Installing and Removing a Blade Server Installing and Removing a Blade Server Hard DriveInstalling a Blade Server Hard Drive Installing and Removing Power Supplies Removing a Blade Server Hard DriveInstalling a Power Supply Positioning a Power Supply in the Cisco UCS Server ChassisRemoving a Power Supply Power Supply Bay and Connector Numbering AC Version ShownInstalling and Removing a Power Distribution Unit PDU Installing a PDURemoving a PDU Installing and Removing FEXesFEX Upgrade Considerations Removing a FEX Installing a FEX Positioning a 4 Port FEX within the Server ChassisInstalling and Removing a Fan Module Installing a Fan ModuleRemoving a Fan Module OL-20035-05 Technical Specifications KVM CableChassis Specifications Description SpecificationEnvironmental Specifications Parameter Symbol Min MaxAC-input Gold Power Supply N20-PAC5-2500W Specifications DC-Input Power Supply N20-DC-2500 Specifications Supported AC Power Cords and Plugs Australia and New ZealandIsrael Continental EuropeInternational Locking 200 to 240 VAC Operation Japan and North AmericaNon-Locking 200 to 240 VAC operation Peoples Republic of China SwitzerlandCAB-ACS-16 Power Cord for the UCS 5108 Blade Server Chassis Site Preparation Checklist Task No. Planning Activity Verified By TimeTask No. Planning Activity Verified By Time Device Serial Number Contact and Site InformationChassis and Module Information Device Serial Number FEX Port Connection Record Connected toPort Fabric Slot Or BOL-20035-05