Trango Broadband TrangoLink-10 user manual Link Test

Page 26

Deployment & Installation

RU Installation and Antenna Alignment

Link Test

Ensure the RU’s default Opmode is “ON,” and that all configuration parameters are correct.

Reboot the radio. Once the radio enters Opmode “ON,” the authentication process will occur with the MU, and the two radios will begin to associate. From the MU side, use the Link Control page to assess the quality of the link.

Enter a duration time for the RF Link Loopback / Speed Test. Click the “loopback test” button. The test will execute and report the success rate (packets sent and received) after the duration period.

A similar test can be performed from the command line interface via the command ru speedtest. Example:

#> ru speedtest

Some traffic may be dropped during testing.

Pkt Len = 1760 bytes, File Size = 10 MBytes, 5958 pkts

Press [space] then [enter] to stop

5.+++*

4.+++*

3.+++*

2.+++*

1.+++*

0.+++*

[M RxGood] 10486080 bytes [R RxGood] 10486080 bytes --> 16750 ms 10016 Kbps

Success.

#>

Trango Broadband Wireless — TrangoLINK-10 User Manual Rev. E 3.0

page 22

Image 26
Contents TrangoLINK-10 Point to Point Wireless Ethernet Bridge Table of Contents Table of Figures Table of TablesFCC Information Warranty InformationPreface Contents OverviewOperational Overview Ethernet and Serial PortsConnections and Power Getting StartedBasic Configuration Concepts and Tools Opmode ConceptSysinfo Telnet ip address of radio Command Line InterfaceTroubleshooting Type resetpassword Serial PortConfiguration This section you willSettings Remote Unit Configuration Screen Basic Diagnostics Master Unit’s System Information CLI Command tftpd on off Set defaultopmode on offIpconfig ip subnet gateway CLI Command set remoteid RU’s MACRfrxth ism CLI Command freq ch polPower setism max min dBm Freq writechannel ch# freqTftpd on off Set defaultopmode onoffRemote Unit System Information Sw 2 on off Sw 0 on offSw 1 on off Site survey Deployment & InstallationSite Selection Mounting Hardware InstallationChannel Planning Mounting Hardware Assembly Cabling and Weather Considerations Standard Mounting Alternative MountingRU Installation and Antenna Alignment RU Antenna Alignment ProcedureLink Test Management RU ManagementObjects for Monitoring and Control RU Bandwidth MonitoringSnmp Setup Command Description RemarkSame as updateflash OFF Appendix B Specifications