Integration of the solar inverter into the PV system

Design of the PV generator

The technical data of the selected PV generator must be within the specifica- tion of the solar inverter (see Technical Data). The Sunways NT Sundim design program for the PV generator may be helpful. Sunways NT Sundim is available on the enclosed CD or from our web- site, www.sunways.de.

Please take account of the following points before planning your system:

·Pay attention to the skyward alignment of the modules. You will obtain maxi- mum yield in Central Europe with a module inclination of 30° to the hori- zontal and a direct southerly alignment of the generator field.

·The output of the cells decreases as the module temperature increases. Install your PV generator with adequate rear ventilation.

·Check your PV generator for soiling ca. every three years. This occurs particularly at the lower edge of the modules and forms a film, which even heavy rain can- not wash away. Decreases in yield can be prevented by cleaning with a wet cloth or a brush.

·Avoid shading of individual modules or solar cells in your system. This can result in heavy losses in yield.

86

Image 10
Contents Manual Solar Inverters NT 2600, NT 4000180 mm 300 mm 510 mm List of Contents General information Information on installationCommissioning Information on operationAppendix General information General safety information Opening the unit Inspecting the delivery Scope of supplyPage Standard components of the PV system PV generator switchStandard components of a PV system SensorEN Mains fuse Energy meterProtection concept Information on installation Mechanical safety Information on cleaning Warm Air 300 mm 150 mm Cool · Thermal interaction · Protection from damp and foreign bodiesElectrical connection and cable entry Fig. Inlets on the unit undersideThree-phase grid connection distributed over three units Grid connectionPage PV generator connection · Preparation · ConnectionImportant information Page Communication connections · Connection Connecting the sensors · Optional irradiation sensor Page Switching the solar inverter on and off · Switching on · Switching off Configurations Plus Minus ESC/CUR UP/DWN Structure and menu levels for configuration SaveLanguage LCD Contrast Software Information on operation Display LineData memory Sunways NT Monitor software Initialising the remote modem Connection and circuitry options Connection to PC via RSIndividual PV system with modem for remote inquiry Connection to modem via RSConnection to PC via RS 485/RS Stripped length 11 mm Jumper JP400 see aboveInverter to299 Connection to modem via RS 485/RS Cable type B Connector To modem Pole Signal cables Configuring the interface cablesPole Signal cables Cable type a FemaleConverter Cable type C Connector To modem PoleLocating jumper JP400 in the Sunways Solar Inverter · Monthly values · Fault dataSunways NT Monitor data acquisition · Online values · 15 minute valuesOperation of Sunways NT Monitor · Setting menu· Data menu · Help menu Line Error UAC1 Overvoltage Line Error UAC3 OvervoltageLine Error UAC3 Undervoltage Line Error UAC1 UndervoltageLine Error AFI Residual current Line Error UDC OvervoltageLine Error Temp Overtemperature Fault diagnosis Fault display Causes UDCFault display Causes UAC3AFI · Warranty period · Conditions· Exclusion of liability Appendix Subject and abbreviation index Designation DescriptionDesignation · Differential measurement Functional principle and explanations· DC and AC filters · Solar inverter with Heric technology· RS 485 and RS 232 interfaces · Microcontroller· LCD display · Sensor interface· MPP control Block diagram PV-GENERATORAFI Technical data Model Solar Inverter NTSolar Inverter NT Page Page Page Page 146 147 148 149 General exclusion of liability Registered trademarksPage Sunways AG Photovoltaic Technology Macairestraße 3