Sunway NT 6000, NT 2600, NT 4000 user manual Inverter to299

Page 42

The signal is looped through all units. Two «RS 485+» terminals and two «RS 485-» terminals are located on each terminal block. This means that the signal can be led into the solar inverter at one terminal and out of the solar inverter at the other termi- nal. The RS 485 signal is led out of the last solar inverter in the series into the interface converter using the following configuration: «RS 485+» to «DATA+» and «RS 485-» to «DATA-».

The interface converter generates an

RS 232 signal. It is connected to the PC with the standard modem cable type D. Jumper JP400 must be closed at the solar inverter that is furthest away from the interface converter. For all other solar inverters it must be open. An address must be alloca- ted, to enable identification of the indivi- dual solar inverters. This is described in Chapter 2.3 Commissioning, under «Configuration».

(4) PV system for 2 to 99 solar inverters with interface converter (IC) and modem for

remote inquiry

PV

INVERTER (1)

 

PV

INVERTER to(299)

 

RS 485

IC RS 232 MODEM

MODEM RS 232

PC

118

Image 42
Contents Manual Solar Inverters NT 2600, NT 4000180 mm 300 mm 510 mm List of Contents General information Information on installationCommissioning Information on operationAppendix General information General safety information Opening the unit Inspecting the delivery Scope of supplyPage Standard components of the PV system PV generator switchStandard components of a PV system SensorEN Mains fuse Energy meterProtection concept Information on installation Mechanical safety Information on cleaning Warm Air 300 mm 150 mm Cool · Thermal interaction · Protection from damp and foreign bodiesElectrical connection and cable entry Fig. Inlets on the unit undersideThree-phase grid connection distributed over three units Grid connectionPage PV generator connection · Preparation · ConnectionImportant information Page Communication connections · Connection Connecting the sensors · Optional irradiation sensor Page Switching the solar inverter on and off · Switching on · Switching off Configurations Plus Minus ESC/CUR UP/DWN Structure and menu levels for configuration SaveLanguage LCD Contrast Software Information on operation Display LineData memory Sunways NT Monitor software Initialising the remote modem Connection and circuitry options Connection to PC via RSIndividual PV system with modem for remote inquiry Connection to modem via RSConnection to PC via RS 485/RS Stripped length 11 mm Jumper JP400 see aboveInverter to299 Connection to modem via RS 485/RS Cable type B Connector To modem Pole Signal cables Configuring the interface cablesPole Signal cables Cable type a FemaleCable type C Connector To modem Pole ConverterLocating jumper JP400 in the Sunways Solar Inverter · Monthly values · Fault dataSunways NT Monitor data acquisition · Online values · 15 minute values· Setting menu Operation of Sunways NT Monitor· Data menu · Help menu Line Error UAC1 Overvoltage Line Error UAC3 OvervoltageLine Error UAC3 Undervoltage Line Error UAC1 UndervoltageLine Error UDC Overvoltage Line Error AFI Residual currentLine Error Temp Overtemperature Fault diagnosis Fault display Causes UDCFault display Causes UAC3AFI · Warranty period · Conditions· Exclusion of liability Appendix Subject and abbreviation index Designation DescriptionDesignation · Differential measurement Functional principle and explanations· DC and AC filters · Solar inverter with Heric technology· RS 485 and RS 232 interfaces · Microcontroller· LCD display · Sensor interface· MPP control Block diagram PV-GENERATORAFI Technical data Model Solar Inverter NTSolar Inverter NT Page Page Page Page 146 147 148 149 General exclusion of liability Registered trademarksPage Sunways AG Photovoltaic Technology Macairestraße 3