Installation | Tank Gauge Transmitter |
|
|
2.2Mounting the Equipment
The ATT is bolted to the Model 2500 Automatic Tank Gauge head as illustrated in Figure
Part Number | Gauge Adapter Kit |
L&J (Shand & Jurs) 92513, 92514, 92020, 92030 | |
|
|
Whessoe 2006, 2026, 2036 and L&J (Shand & Jurs) 92006 | |
|
|
Mounting the ATT to the Level Gauge is accomplished in the following manner:
1.Remove the back cover of the Level Gauge.
2.Remove the access cap from the back cover of the Level Gauge.
3.Mount the ATT in place of the access cap, making certain that the word "TOP" cast into the housing lines up with the top of the Level Gauge back cover.
4.Install the Level Gauge back cover with the transmitter in the Level Gauge. Make certain that the slot in the ATT drive coupling engages with the pin on the tape sheave of the Level Gauge.
5.Proceed with field wiring.
Drive coupling
Transmitter
Back cover
Junction box cover
Integral junction box
| Back Cover |
External enclosure ground | External Ground Lug |
connection by installer |
|
| Gauge cover mounting |
| bolts (15 places) |
Pin drive
Sprocket Sheave
2500
Automatic Tank Gauge
Figure 2-2: ATT Mounting Diagram
4 | Installation and Operations Manual |