American Power Conversion 200/208 V, 10-30 KVA manual Operation, Introduction

Page 11

Operation

Introduction

Welcome to the Operation Manual covering the Smart-UPS®VT UPS and the Extended Run Battery Enclosure (XR Battery Enclosure). This manual provides you with a detailed description of start-up, operation, and troubleshooting.

Separate manuals are available on:

Receiving and Unpacking part no. 990-2358.

UPS Site preparation and Installation part no. 990-2360.

XR Site preparation and Installation part no. 990-2357.

NOTE!

For more details on APC products and services, visit us at www.apc.com

WARNING!

Only trained person familiar with the construction and operation of the equipment, including the electrical and mechanical hazards involved, may install and remove system components.

NOTE!

Details on the UPS sizes, runtime, weight etc. are available in the Appendix under “System sizes, part nos., number of Battery Modules and weights” on page 40

NOTE!

Most illustrations show 523mm Enclosures but apply to both Enclosure sizes. Any differences between the two Enclosure sizes will be addressed in the manual.

990-2359A Smart-UPS® VT 10-30kVA, 200/208V and XR Battery Enclosure Operation Guide

3

Image 11
Contents Operation Page Smart-UPSVT and XR Battery Enclosure10-30 kVA 200/208 Page Contents Appendix Options Page General safety General Safety InstructionsSymbols used in this guide Environmental symbolsSafety General Safety Instructions Introduction Operation523mm Enclosures Smart-UPS VT Family Range352mm Enclosures Operation Modes Introduction DisplayStatus NavigationControl functions Basic display navigation principlesStatus views Select YES, Turn Load OffDate Clock set-upLogging TimeDisplay setup Alarm thresholdDiagnostics screen From the Display Setup Menu, select ContrastMain Menu Display messages Display Messages/TroubleshootingOperation Display Messages/Troubleshooting Display Message Meaning Corrective Action Front Panel removal Remove Battery Compartment Cover Battery Compartment Cover installation Front Panel installation Total-Power-Off Procedure Power application Restart ProcedureEnter Voltage confirmationTurn into mechanical bypass Mechanical BypassMechanical Bypass Lever Page Network Management Card with Environmental Monitor Network Management Card replacementBattery Module Battery ReplacementGeneral safety prior to module replacement Removal and installation of Battery Lock if applicable How to install a Battery Module Battery Module removal  Orderable parts How to Obtain Replacement PartsUPS Components and Options AppendixType label Serial number24kg Part number codingStabilizing Bracket User interface Foot print Options Extended Run Battery Enclosure XR Battery EnclosurePart number for Battery Module Part numbers for XR Battery EnclosuresAppendix Options Appendix Options Page 990-2359A