American Power Conversion 480kW 400V manual Order of Management Peripheral Cards

Page 21

External Connection

4.7.3.1 Order of Management Peripheral Cards

Because UPS signals are passed between management peripherals, you must install management peripheral cards in the correct order for them to work together properly. The card slots are numbered 1 to 3, from left to right, as viewed from the rear of the chassis. The following table lists the management peripheral cards, their priority, and proper position.

Management Peripheral

P/N

Priority

Position

Card

 

 

 

 

 

 

 

 

 

Web/SNMP Management

AP9606

Highest

High-numbered slot

Card

 

 

 

 

 

 

 

 

 

 

 

Out-of-Band Management

 

 

 

 

 

 

 

 

Card

AP9608

Second-highest

 

 

(Call-UPS®II)

 

 

 

 

Interface Expander

AP9607

Second lowest

 

 

 

 

 

 

 

Environmental Monitoring

AP9612T

Lowest

 

 

Card (Measure-UPS®II)

AP9612TH

Low-numbered slot

 

 

 

 

 

 

 

 

 

4.7.3.2 Installing Management Peripheral Cards

To install management peripherals, perform the following steps.

1)Make sure that the chassis is powered off.

2)Install management peripheral cards into the housings on the rear of the chassis. See the instructions supplied with the cards and the table above.

3)If you are daisy-chaining other APC external management peripherals to the APC Silcon Triple Chassis: Connect the UPS cable (supplied with the management peripheral) to the Monitoring port of the chassis and to the “To UPS” port of the other management peripheral (Share-UPS, MasterSwitch, etc.). See “Daisy-chaining the APC Silcon Triple Chassis”.

4)Power the APC Silcon Triple Chassis and all external management peripherals.

NOTICE!

If your configuration requires additional power, connect a 24V AC/DC power adapter available from APC (part number AP9505 or AP9505i) for all models of Triple Chassis.

4.7.3.3 Daisy-chaining the APC Silcon Triple Chassis

If you need more than the three card slots available with the APC Silcon Triple Chassis, or if you want to use other external management peripherals, you can daisy-chain external management peripherals together, provided that the total amperage of all installed management peripherals — cards and external — does not exceed the supplied amperage. (See “Determining Power Requirements:”).

NOTICE!

When daisy-chaining Triple Chassis units, you may need to use a power adapter.

990-4059

Installation Guide APC Silcon 480kW 400V UPS

21

Image 21
Contents 480kW 400V UPS Installation Guide Installation Guide APC Silcon 480kW 400V UPS Safety Symbols used in this manualThank You Introduction IntroductionTools and Equipment ToolsUnpacking UnpackingInstallation InstallationRequirements on Site Height mm Width mm Depth mm 480kW 1800 1900Footprint 1 1900mm Cabinet for 480kW UPS2 1600mm Cabinet for 480kW Isolation Transformer External Connection Connecting the UPSExternal Connection Right side viewSystem Integration Interface External Connection Connections X005 Output Relays Terminal Blocks X003/X004 Anxiliary ContactsParallel Board Parallel BoardExternal Control Cables Power CablesRelays Relay BoardRelay Board/Relay Functions Relay Number Message Alarm-trigging EventsSee .2 System configuration Communication Interface Board Connecting of APC Silcon Tripel Chassis APC Silcon Triple Chassis Safety WarningsProduct Description Monitoring PortInstalling Management Peripherals Optional Power InputLEDs If the LED is… Then the Silcon Triple Chassis…Order of Management Peripheral Cards Installing Management Peripheral CardsManagement Peripheral Priority Position Card Daisy-chaining the APC Silcon Triple ChassisManagement Peripheral Draw mA Troubleshooting Problem Possible Cause SolutionIf Problems Persist Product Specifications Monitoring Port Pin Assignments External Connection Specification Power, Physical, and Environmental SpecificationsImportant Safety Instructions APC Silcon Battery CabinetsBattery Breaker Box/Fuse-box Installation of BatteriesSilcon Battery Breaker Box APC Battery Breaker Box Connection Diagram 120-480kW Ampere Connection Max Dimensions Weight Rating CableHxWxD mm CircuitExternal Connection Programming Parameters Parameter Setting CommentsProgramming Parameters ParametersProgramming Keys Programming Example Switch to Bypass Operation System ConfigurationSystem Configuration Parameters password protected Programming Example Change Charge Voltage to Programming Parameters Programming Parameters for Advanced Parallel Operation Description of SettingsProgramming example Battery MonitorProgramming Parameters Options/Accessories Options/AccessoriesService Bypass Panel for Single Operation Options/Accessories Action On Service Bypass PanelDisplay shows Lamp indicationLamp indication On Servive Bypass Panel Switching from External Bypass to Normal UPS OperationService Bypass Panel for Parallel Redundant Operation Two Parallel Systems with Service Bypass Panel Options/Accessories Options/Accessories Action H002a Lamp indication On Service Bypass Panel Following can be carried out on any UPS Switching Back to Normal Parallel/Redundant Operation Isolating One UPS for Service/MaintenanceIntersystem Synchronization Unit Intersystem Synchronization Unit System ISU SystemIntersystem Synchronization Unit ISU Remote Display Extension of Remote Display Communication DistanceStandard Short-haul RS232 Modem Async Host DTE Remote Display DTE Connections Without ConverterConnections With Converter Pin Connections for cable from host to ME800A-R2 HostRemote Display Cables Remote Display Power SupplyRemote Display Setting Communication FaultAlarms Remote Display UseIsolation Transformer Height Width Depth WeightIsolation 540kVA 480kW 1800 1400 2550Example of Transformer Configuration Yyno External External PE Connecting Isolation Transformer540kW 1000 200Options/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories System Specifications System SpecificationsTechnical Data Dimensions / WeightWarranty WarrantyAPC Silcon Series Limited Factory Warranty Installation Planning Data AppendixAppendix Appendix How to Contact APC How to Contact APCAPC Corporate APC Denmark