American Power Conversion 480kW 400V APC Silcon Battery Cabinets, Important Safety Instructions

Page 27

External Connection

4.8APC Silcon Battery Cabinets

IMPORTANT SAFETY INSTRUCTIONS

aThe installation of battery drawers in UPS cabinets requires battery knowledge and should be made or supervised by qualified personnel only. Keep unauthorized personnel away from batteries.

bUse identical battery types and numbers when replacing batteries. See battery supplier manual for further details.

cCAUTION - Do not dispose of batteries in a fire. Battery may explode.

dCAUTION - Batteries are fully charged on delivery. Do not short battery terminals or DC terminals.

eCAUTION - Avoid rough treatment and opening of batteries. Released electrolyte is harmful to skin and eyes and may be toxic.

fCAUTION - Batteries may cause electric shocks and high voltage short-circuit current. Follow below precautions when working with batteries:

1Remove watches, rings and other metal objects.

2Use tools with insulated handles.

3Wear rubber gloves and boots.

4Do not leave tools or metal parts on top of batteries.

5Disconnect charging source prior to connecting batteries.

Installation and use of this product must comply with all national, federal, state, municipal or local codes. If you need assistance, please have your UPS model and serial number ready and call APC, see “How to Contact APC” in this guide.

For more information on the APC World Wide Web site at http://www.apc.com or www.apc.co.jp.

WARNING!

The entire system contains HAZARDOUS AC/DC VOLTAGES from several power sources. Some terminals and components are live even with the system being switched off!

ONLY qualified electricians should carry out installations according to national and local codes.

NO UPS types may have built-in batteries when connected to external batteries!

NEVER install batteries not complying with APC specifications. Failing that, the installer takes over full responsibility!

NEVER lift or transport connected or installed batteries.

NOTICE!

For reliability reasons do not stand on the UPS. keep the UPS cabinet surface free of any objects.

990-4059

Installation Guide APC Silcon 480kW 400V UPS

27

Image 27
Contents 480kW 400V UPS Installation Guide Installation Guide APC Silcon 480kW 400V UPS Safety Symbols used in this manualThank You Tools IntroductionIntroduction Tools and EquipmentUnpacking UnpackingHeight mm Width mm Depth mm 480kW 1800 1900 InstallationInstallation Requirements on SiteFootprint 1 1900mm Cabinet for 480kW UPS2 1600mm Cabinet for 480kW Isolation Transformer Right side view Connecting the UPSExternal Connection External ConnectionSystem Integration Interface External Connection Connections X005 Output Relays Terminal Blocks X003/X004 Anxiliary ContactsParallel Board Parallel BoardExternal Control Cables Power CablesRelays Relay BoardRelay Board/Relay Functions Relay Number Message Alarm-trigging EventsSee .2 System configuration Communication Interface Board Connecting of APC Silcon Tripel Chassis Monitoring Port Safety WarningsAPC Silcon Triple Chassis Product DescriptionIf the LED is… Then the Silcon Triple Chassis… Optional Power InputInstalling Management Peripherals LEDsDaisy-chaining the APC Silcon Triple Chassis Installing Management Peripheral CardsOrder of Management Peripheral Cards Management Peripheral Priority Position CardManagement Peripheral Draw mA Troubleshooting Problem Possible Cause SolutionIf Problems Persist Product Specifications Monitoring Port Pin Assignments External Connection Specification Power, Physical, and Environmental SpecificationsImportant Safety Instructions APC Silcon Battery CabinetsBattery Breaker Box/Fuse-box Installation of BatteriesSilcon Battery Breaker Box Circuit Ampere Connection Max Dimensions Weight Rating CableAPC Battery Breaker Box Connection Diagram 120-480kW HxWxD mmExternal Connection Parameters Parameter Setting CommentsProgramming Parameters Programming ParametersProgramming Keys Programming Example Switch to Bypass Operation System ConfigurationSystem Configuration Parameters password protected Programming Example Change Charge Voltage to Programming Parameters Programming Parameters for Advanced Parallel Operation Description of SettingsProgramming example Battery MonitorProgramming Parameters Options/Accessories Options/AccessoriesService Bypass Panel for Single Operation Options/Accessories Lamp indication On Service Bypass PanelAction Display showsLamp indication On Servive Bypass Panel Switching from External Bypass to Normal UPS OperationService Bypass Panel for Parallel Redundant Operation Two Parallel Systems with Service Bypass Panel Options/Accessories Options/Accessories Action H002a Lamp indication On Service Bypass Panel Following can be carried out on any UPS Switching Back to Normal Parallel/Redundant Operation Isolating One UPS for Service/MaintenanceIntersystem Synchronization Unit Intersystem Synchronization Unit System ISU SystemIntersystem Synchronization Unit ISU Remote Display Extension of Remote Display Communication DistanceStandard Short-haul RS232 Modem Async Pin Connections for cable from host to ME800A-R2 Host Connections Without ConverterHost DTE Remote Display DTE Connections With ConverterRemote Display Cables Remote Display Power SupplyRemote Display Use Communication FaultRemote Display Setting Alarms540kVA 480kW 1800 1400 2550 Height Width Depth WeightIsolation Transformer IsolationExample of Transformer Configuration Yyno 1000 200 Connecting Isolation TransformerExternal External PE 540kWOptions/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories Dimensions / Weight System SpecificationsSystem Specifications Technical DataWarranty WarrantyAPC Silcon Series Limited Factory Warranty Installation Planning Data AppendixAppendix Appendix APC Denmark How to Contact APCHow to Contact APC APC Corporate