Installation
3.0Installation
3.1Requirements on Site
All system parts are accessible from front or top of UPS. Cable entries are accessible from bottom. A
For ventilation and service purposes allow for free space of minimum 1m above the unit or per national and/or local codes and in front of UPS. Never install systems in direct sunlight.
NOTICE!
For reliability reasons do not stand on the UPS. Keep the UPS cabinet surface free of any objects.
3.1.1 Cabinet Dimensions
UPS | Height [mm] | Width [mm] | Depth [mm] |
|
|
|
|
480kW | 1800 | 1900 | 800 |
|
|
|
|
Cabinet
1900 mm wide
1800 mm
480kW
1600 mm wide
1800 mm
APC Isolation
Transformer Module
420kW
| |
|
|
Installation Guide APC Silcon 480kW 400V UPS | 5 |