American Power Conversion 480kW 400V manual Programming Parameters, Parameter Setting Comments

Page 32

Programming Parameters

5.0 Programming Parameters

Below table shows operating parameters programmable from keyboard. Only qualified users should re-set programming parameters.

5.1Parameters

Parameter

Setting*

Comments

 

 

 

 

 

 

 

 

 

 

Bypass operation

YES, NO

YES will switch the system into bypass mode

 

 

 

 

 

 

 

 

 

GB, D, F

 

 

 

 

 

 

Language

DK, S, SF

Language of text in display

NL, PL, CZ

 

 

 

 

 

 

 

 

E, P, SK, H

 

 

 

 

 

 

 

 

 

 

 

 

Autostart

YES, NO

Automatic restart by mains return

(1 min.delay). Ensures quick battery recharge

 

 

 

 

 

 

 

 

Remote shutdown active

YES, NO

Shutdown of UPS by remote signal when in

battery operation. Saves battery energy

 

 

 

 

 

 

 

 

Remote shutdown

HIGH, LOW

Nature of remote shutdown signal level

 

 

 

 

 

 

 

 

 

0, 1, 2, 3, 4

 

 

 

 

 

 

Remote shutdown time

5, 6, 7, 8, 9

Time delay on remote shutdown of UPS

 

10 min.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Initiates back-up time check.

Battery capacity test

---

Time measured from start until it reaches low

DC warning level.

 

 

 

 

 

 

(See User Guide section 6 )

 

 

 

 

 

 

Battery monitor test**

---

Initiates checks of battery condition by 25%

discharging

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Automatic battery test**

OFF, 3, 6 months

Activates the battery monitor test in cyclic

intervals

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Battery monitor reset**

---

Press the

 

and

 

 

key

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

to resets alarm (flashing light)!

 

 

 

 

 

 

 

 

Boost charge

YES, NO

YES results in boost charge (10 hours)

 

 

 

 

 

 

Autoboost charge

YES, NO

YES results in boost charge after battery

operation. (10 hours)

 

 

 

 

 

 

 

 

 

 

 

Enter new date

YYMMDD

Set tolocal date

 

 

 

 

 

 

 

Enter new time

HHMMSS

Set to local time (24 hour clock)

 

 

 

 

 

 

 

 

*Factory settings in bold

**Only for systems with Battery Monitor active

***Do not leave system running in bypass mode (Static bypass) for extended periodes of time, as batteries are not recharged in bypass mode.

990-4059

32

Installation Guide APC Silcon 480kW 400V UPS

Image 32
Contents 480kW 400V UPS Installation Guide Thank You Installation Guide APC Silcon 480kW 400V UPSSafety Symbols used in this manual Introduction IntroductionTools and Equipment ToolsUnpacking UnpackingInstallation InstallationRequirements on Site Height mm Width mm Depth mm 480kW 1800 19002 1600mm Cabinet for 480kW Isolation Transformer Footprint1 1900mm Cabinet for 480kW UPS Connecting the UPS External ConnectionExternal Connection Right side viewSystem Integration Interface External Connection Connections Terminal Blocks X003/X004 Anxiliary Contacts X005 Output RelaysParallel Board Parallel BoardPower Cables External Control CablesRelay Board RelaysRelay Number Message Alarm-trigging Events Relay Board/Relay FunctionsSee .2 System configuration Communication Interface Board Connecting of APC Silcon Tripel Chassis Safety Warnings APC Silcon Triple ChassisProduct Description Monitoring PortOptional Power Input Installing Management PeripheralsLEDs If the LED is… Then the Silcon Triple Chassis…Installing Management Peripheral Cards Order of Management Peripheral CardsManagement Peripheral Priority Position Card Daisy-chaining the APC Silcon Triple ChassisManagement Peripheral Draw mA If Problems Persist TroubleshootingProblem Possible Cause Solution Product Specifications Monitoring Port Pin Assignments External Connection Power, Physical, and Environmental Specifications SpecificationAPC Silcon Battery Cabinets Important Safety InstructionsSilcon Battery Breaker Box/Fuse-boxInstallation of Batteries Battery Breaker Box Ampere Connection Max Dimensions Weight Rating Cable APC Battery Breaker Box Connection Diagram 120-480kWHxWxD mm CircuitExternal Connection Parameter Setting Comments Programming ParametersProgramming Parameters ParametersProgramming Keys System Configuration Programming Example Switch to Bypass OperationSystem Configuration Parameters password protected Programming Example Change Charge Voltage to Programming Parameters Description of Settings Programming Parameters for Advanced Parallel OperationBattery Monitor Programming exampleProgramming Parameters Service Bypass Panel for Single Operation Options/AccessoriesOptions/Accessories Options/Accessories On Service Bypass Panel ActionDisplay shows Lamp indicationSwitching from External Bypass to Normal UPS Operation Lamp indication On Servive Bypass PanelService Bypass Panel for Parallel Redundant Operation Two Parallel Systems with Service Bypass Panel Options/Accessories Options/Accessories Action H002a Lamp indication On Service Bypass Panel Following can be carried out on any UPS Isolating One UPS for Service/Maintenance Switching Back to Normal Parallel/Redundant OperationIntersystem Synchronization Unit ISU Intersystem Synchronization UnitIntersystem Synchronization Unit System ISU System Standard Short-haul RS232 Modem Async Remote DisplayExtension of Remote Display Communication Distance Connections Without Converter Host DTE Remote Display DTEConnections With Converter Pin Connections for cable from host to ME800A-R2 HostRemote Display Power Supply Remote Display CablesCommunication Fault Remote Display SettingAlarms Remote Display UseHeight Width Depth Weight Isolation TransformerIsolation 540kVA 480kW 1800 1400 2550Example of Transformer Configuration Yyno Connecting Isolation Transformer External External PE540kW 1000 200Options/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories System Specifications System SpecificationsTechnical Data Dimensions / WeightAPC Silcon Series Limited Factory Warranty WarrantyWarranty Appendix Installation Planning DataAppendix Appendix How to Contact APC How to Contact APCAPC Corporate APC Denmark