American Power Conversion 480kW 400V manual Intersystem Synchronization Unit

Page 54

Options/Accessories

6.3Intersystem Synchronization Unit

Intersystem Synchronization Unit System (ISU System)

The ISU system consists of inter-connected ISUs. One ISU system may consist of up to 5 ISUs, regardles of ISU configuration. The ISU system synchronizes the voltage of parallel operation systems running in battery operation.

The ISU system may also include one or more external synchronization sources, e.g. a gen-set or a non-APC Silcon UPS system.

Synchronization accuracy of the ISU is better than 2o.

Schematic overview of ISU system (example):

UPS 1A

UPS 3A

UPS 1B

Parallel

Operation

System 1

ISU

1

ISU

3

Parallel

Operation

System 3

UPS 1C

UPS 2A

 

ISU System

UPS 3C

UPS 2B

Parallel

Operation

System 2

ISU

2

ISU

4

ISU

5

UPS 2C

UPS 4

Ext. sync Source

UPS 3B

Intersystem Synchronization Unit (ISU)

The ISU is an active part of an ISU system, serving as the interface to the sources and the ISU system.

The ISU can be connected to a parallel UPS configuration, using the standard parallel communication controller in the parallel operation system.

(See Intersystem Synchronization Unit User’s Manual for further details.)

6.4

990-4059

54

Installation Guide APC Silcon 480kW 400V UPS

Image 54
Contents 480kW 400V UPS Installation Guide Installation Guide APC Silcon 480kW 400V UPS Safety Symbols used in this manualThank You Tools and Equipment IntroductionIntroduction ToolsUnpacking UnpackingRequirements on Site InstallationInstallation Height mm Width mm Depth mm 480kW 1800 1900Footprint 1 1900mm Cabinet for 480kW UPS2 1600mm Cabinet for 480kW Isolation Transformer External Connection Connecting the UPSExternal Connection Right side viewSystem Integration Interface External Connection Connections Terminal Blocks X003/X004 Anxiliary Contacts X005 Output RelaysParallel Board Parallel BoardPower Cables External Control CablesRelay Board RelaysRelay Number Message Alarm-trigging Events Relay Board/Relay FunctionsSee .2 System configuration Communication Interface Board Connecting of APC Silcon Tripel Chassis Product Description Safety WarningsAPC Silcon Triple Chassis Monitoring PortLEDs Optional Power InputInstalling Management Peripherals If the LED is… Then the Silcon Triple Chassis…Management Peripheral Priority Position Card Installing Management Peripheral CardsOrder of Management Peripheral Cards Daisy-chaining the APC Silcon Triple ChassisManagement Peripheral Draw mA Troubleshooting Problem Possible Cause SolutionIf Problems Persist Product Specifications Monitoring Port Pin Assignments External Connection Power, Physical, and Environmental Specifications SpecificationAPC Silcon Battery Cabinets Important Safety InstructionsBattery Breaker Box/Fuse-box Installation of BatteriesSilcon Battery Breaker Box HxWxD mm Ampere Connection Max Dimensions Weight Rating CableAPC Battery Breaker Box Connection Diagram 120-480kW CircuitExternal Connection Programming Parameters Parameter Setting CommentsProgramming Parameters ParametersProgramming Keys System Configuration Programming Example Switch to Bypass OperationSystem Configuration Parameters password protected Programming Example Change Charge Voltage to Programming Parameters Description of Settings Programming Parameters for Advanced Parallel OperationBattery Monitor Programming exampleProgramming Parameters Options/Accessories Options/AccessoriesService Bypass Panel for Single Operation Options/Accessories Display shows On Service Bypass PanelAction Lamp indicationSwitching from External Bypass to Normal UPS Operation Lamp indication On Servive Bypass PanelService Bypass Panel for Parallel Redundant Operation Two Parallel Systems with Service Bypass Panel Options/Accessories Options/Accessories Action H002a Lamp indication On Service Bypass Panel Following can be carried out on any UPS Isolating One UPS for Service/Maintenance Switching Back to Normal Parallel/Redundant OperationIntersystem Synchronization Unit Intersystem Synchronization Unit System ISU SystemIntersystem Synchronization Unit ISU Remote Display Extension of Remote Display Communication DistanceStandard Short-haul RS232 Modem Async Connections With Converter Connections Without ConverterHost DTE Remote Display DTE Pin Connections for cable from host to ME800A-R2 HostRemote Display Power Supply Remote Display CablesAlarms Communication FaultRemote Display Setting Remote Display UseIsolation Height Width Depth WeightIsolation Transformer 540kVA 480kW 1800 1400 2550Example of Transformer Configuration Yyno 540kW Connecting Isolation TransformerExternal External PE 1000 200Options/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories Technical Data System SpecificationsSystem Specifications Dimensions / WeightWarranty WarrantyAPC Silcon Series Limited Factory Warranty Installation Planning Data AppendixAppendix Appendix APC Corporate How to Contact APCHow to Contact APC APC Denmark