American Power Conversion 5000T, 2200XLT To see the change in number of external battery packs

Page 28

Use the HyperTerminal Program to Change the Number of External Battery Packs

HyperTerminal is used for Windows 95, Windows 98, and Windows NT 4.0

1.EXIT out of the PowerChute plus Server. In the case of Windows NT, the UPS service must be stopped.

2.From the Desktop, go to: Start => Programs => Accessories => HyperTerminal. Double-click on the HyperTerminal icon.

3.You are prompted to choose a name and select an icon. Give any name and then click OK. If a message appears which reads "...must install a modem," disregard it and continue.

4.The port settings are 2400 baud, 8 data bits, 1 stop bit, no parity, flow control is Xon/Xoff.

5.Click on Advanced and ensure the box labeled FIFO buffer is NOT checked.

6.Click OK twice.

7.Once the terminal/hyperterminal window is open, follow these steps:

Step Number

Type

Produced Effect

1

Y

Produces SM

 

 

 

2

>

To see the number of external packs. (A new unit will display 000.)

 

 

 

3

+

Adds a battery pack.

 

 

 

4

>

To see the change in number of external battery packs.

 

 

 

5

-

Subtracts a battery pack.

 

 

 

6

>

To see the change in number of external battery packs.

 

 

 

990-7031C, Revision 4 12/99

22

Image 28
Contents 990-7031C, Revision 4 12/99 990-7031C, Revision 4 12/99 Electrical Safety Handling SafetyReplacement and Recycling of Batteries Page Table of Contents Page Contents How to Unpack the SU 5000 UPSIntroduction UnpackingPlacement InstallationInstalling Rack Mount Units Determine the Location of the UPS in the Rack Load the UPS into the Rack Rack Mount OptionsConnect the Batteries Tower Units3U Rack Mount Units 5U Rack Mount UnitsInitial Startup Rear ViewsCharge the battery Connect Ground Leads to Tvss Connector OptionalBattery Pack Connector Optional Low Battery Warning IntervalOperating Instructions Low Battery Load Bar GraphOverload SmartTrimReplacing the Battery StorageStorage Conditions Extended storageBattery Replacement Procedure Tower Units Battery Replacement Procedure 3U Rack Mount Units Battery Replacement Procedure 5U Rack Mount Units User Configuration Items How to Determine On-Battery Run TimeTypical On-Battery Runtime Versus Load, in Hours Tower and 5U Models 1400VA and 2200VA ModelsTypical On-Battery Run Time Versus Load, in Hours Load VA Internal Battery VA w/ 1 Battery PackTower and 5U Rack Mount Models 3000 & 5000 VA Models 3U Rack Mount Models 2200 & 3000 VA ModelsSpecifications 1400 VA 2200 VA 3000 VA 5000 VATroubleshooting Service Limited WarrantyIf the UPS requires service do not return it to the dealer APC Contact InformationXL Installation Appendix a XL InformationUse the Smart-UPS Battery Pack Utility Battpack Smart-UPS Battery ProtocolClick on Configuration Click on UPS Operating Parameters To see the change in number of external battery packs Racks Rack Type Hole Type Hardware Required Hardware IncludedAppendix C Transporting Your Smart-UPS