American Power Conversion 3000T, 5000T, 2200XLT, 1400XLT user manual

Page 6
Image 6
Contents 990-7031C, Revision 4 12/99 990-7031C, Revision 4 12/99 Handling Safety Electrical SafetyReplacement and Recycling of Batteries Page Table of Contents Page Introduction ContentsHow to Unpack the SU 5000 UPS UnpackingInstallation PlacementInstalling Rack Mount Units Determine the Location of the UPS in the Rack Load the UPS into the Rack Rack Mount OptionsConnect the Batteries Tower Units3U Rack Mount Units 5U Rack Mount UnitsInitial Startup Rear ViewsBattery Pack Connector Optional Charge the batteryConnect Ground Leads to Tvss Connector Optional Low Battery Warning IntervalOperating Instructions Overload Low BatteryLoad Bar Graph SmartTrimStorage Conditions Replacing the BatteryStorage Extended storageBattery Replacement Procedure Tower Units Battery Replacement Procedure 3U Rack Mount Units Battery Replacement Procedure 5U Rack Mount Units Typical On-Battery Runtime Versus Load, in Hours User Configuration ItemsHow to Determine On-Battery Run Time Tower and 5U Models 1400VA and 2200VA ModelsTower and 5U Rack Mount Models 3000 & 5000 VA Models Typical On-Battery Run Time Versus Load, in HoursLoad VA Internal Battery VA w/ 1 Battery Pack 3U Rack Mount Models 2200 & 3000 VA ModelsSpecifications 1400 VA 2200 VA 3000 VA 5000 VATroubleshooting If the UPS requires service do not return it to the dealer ServiceLimited Warranty APC Contact InformationXL Installation Appendix a XL InformationSmart-UPS Battery Protocol Use the Smart-UPS Battery Pack Utility BattpackClick on Configuration Click on UPS Operating Parameters To see the change in number of external battery packs Racks Rack Type Hole Type Hardware Required Hardware IncludedAppendix C Transporting Your Smart-UPS