Epson TM-U375 user manual Running the self-test with validation paper

Page 29

5.The self-test automatically ends after printing "*** completed ***". The printer is ready to receive data from the computer after the self-test completes.

6.Self-test mode switches to normal mode.

Running the self-test with validation paper

Qa, Note:Be sure to install the paper roll in the printer to prevent validation paper jams.

1.Make sure the printer is turned off and the printer cover is closed properly.

2.Hold down the PAPER FEED and RELEASE buttons and turn on the printer to begin the self-test. The VALIDATION/SLIP light flashes.

3.Feed a sheet of validation paper into the printer. The self-test prints the printer settings, and then ejects the paper. The VALIDATION/SLIP light flashes.

4.Remove the paper and feed another sheet of validation paper into the printer to print characters from the character table. Continue to feed

validation paper into the printer until the self-test prints "*** completed

***".

5.The self-test automatically ends after printing "*** completed ***". The printer is ready to receive data from the computer after the self-test completes.

6.Self-test mode switches to normal mode.

,Note:

%If you want to pause the self-test for the paper roll, slip paper, or validation paper at any point, press the PAPER FEED button. Press the PAPER FEED button again to resume the self-test.

Setting Up the Printer 1-19

Image 29
Contents TM-U375 Control Panel Printer Part NamesPage EMC and Safety Standards Applied CE Marking Gereäuschpegel About This Manual Setting up and Using FeaturesReference Contents Reference Information TroubleshootingSetting Up the Printer Removing the Protective Materials UnpackingProtective material Remove the protective materials C as the illustration Connecting the Printer to Your Computer TM-U375TM-U375P Connecting the Printer to Your Drawer TM-U375 TM-U375P Anschließen des Druckers an lhre Geldlade AchtungAchtung TM-U375 Grounding the Printer Connecting the Power Supply Plug the power supply’s power cord into an electrical outlet Installing the Ribbon Cassette Setting Up the Printer 1 1 Installing the Paper Roll Paper inlet Paper Load switch Running the self-test with the slip paper Running the Self-testRunning the self-test with paper roll Running the self-test with validation paper Setting the DIP Switches DIP Switch Set TM-U375 DIP-switch functions42CPL/35CPL 40CPL/33CPL TM-U375P DIP-switch functionsAdjusting the Paper Roll End Sensing Position Distance a Adjustment position number Using the Power Switch Cover Using the Printer Lndicator lights Operating the Control PanelButtons Page Validation Paper Handling Slip Paper HandlingReplacing the Paper Roll Replacing the Ribbon Cassette Qsh Removing the ribbon cassetteOr 3 times Print head Troubleshooting Printing problems General problemsError light is off but nothing is printed Page Release lever Left side of the printer Starting hexadecimal dumping Hexadecimal DumpingEnding hexadecimal dumping Reference Information Character Specifications Printing SpecificationsPaper Paper SpecificationsNumber of Copies Ambient Temperature Glue Location of Slip paper Page Humidity Environmental SpecificationsPrinting on Cut Sheets Interface SpecificationsPage Example print control for cut sheet Transmit Status Identification 12 c