Toshiba 300 KW operation manual Installation, Keep the Specified Clearance around the UPS

Page 34

10 Installation

WARNING

Keep the SPECIFIED CLEARANCE around the UPS.

Inadequate space around the UPS makes it difficult to perform maintenance/inspections, lead to insufficient ventilation, and/or will cause malfunctions.

See Figure 10.1 - UPS Clearance

DO NOT tilt the UPS more than 10° from upright position.

Tilting the UPS more than 10° may cause crushing, trapping or other personal injuries.

Install anchor bolts to secure the UPS to the installation floor.

The UPS may fall during an earthquake if the anchor bolts are not installed and secured.

DO NOT transport, move, store, or place the UPS on its side.

Forces due to heavy components inside may damage the UPS.

DO NOT allow the UPS to suffer shock or impact when unpacking.

Tools used to remove packaging materials may cause damage to the

UPS.

DO NOT push or pull on the sides of the packaging.or the UPS to move it. Always use a crane, forklift, or pallet jack for transporting and positioning the UPS.

Pushing/pulling on the sides of the unit to move it may result in damage to the UPS. See Figure 4.1 Exterior Handling label.

26

G8000 Series Installation and Operation Manual

Image 34
Contents G8000 Series Page Document July Qualified Personnel only Uninterruptible Power System UPS Toshiba Customer Support Center PurposeToshiba’s Customer Support Center Toshiba International CorporationTable of Contents 11.4 Introduction Symbols General Safety InstructionsProhibited Symbol indicates do not take action Signal Words Qualified PersonnelImportant Safety Instructions Factory Authorized PersonnelSafety Precautions DisclaimerTransporting/Unpacking General MaintenanceKeep the area arround the UPS clean Do not tilt the UPS more than 10 from upright positionDo not transport, move, store, or place the UPS on its side Avoid vibration or shock exceeding 0.5GInspection/Storage Install the UPS in a controlled environment Installation PrecautionsKeep the Specified Clearance around the UPS Do not install the UPS where water may fall on it Do not block air ventsInstallation Precautions Environment standardMetal Conduit is not AN Acceptable Ground Conductor Routing and GroundingConnect only one 1 ground wire to the earth ground terminal Wiring/ConnectionPerform wiring and connections with correct polarity Follow the torque criteria for tightening screwsFor 100, 150, 225KVA GND 150/225 KVA UPS Warning Labels Weight and Dimensions Model Unit Shipping300 KVA UPS Exterior Dimensions Inches Transporting Transporting By Crane 8.5 show examples of acceptable and unacceptable operationsTransporting By Forklift Transporting UPS by ForkliftOperating Precautions Storage/Operating EnvironmentPage Qualified Personnel only Maintenance PrecautionsQualified Personnel shall Do not dispose of the batteries in a fire DisposalDo not open or mutilate the batteries Installation Unpacking UPS ClearanceAnchor Bolt Installation Detail Anchor BoltsUPS Wiring External Wiring Diagram11.1 100 kVA Terminal Blocks and Power Cables Block Number Cable Size Tightening TorqueAC Input Bypass Input AC Output Battery YA36L Block Number Cable Size Recommended Fastener TorqueBus Number Cable Size Recommended Fastener Torque UPS Power Cable Knockout Plates Bottom Cable Knockout Plates for 100 KVA T80S3K10KK6XS2HPlate #2 Plate #3 Terminal Knockout Plates for the 300 KVA UPSExternal Breakers Grounding WireBe sure to ground the UPS as specified G8000 100 kVA G8000 150/225 kVA Control Wires Signal Name Operation11 Connection Between UPS, Battery Cabinet & Bypass Breaker Grounding Configuration 12 Grounding Configuration with Input Neutral GroundedGrounding Configuration without input neutral Recommended Configuration for delta-inputGrounding Configuration with corner-grounded delta-input 16 Grounding Configuration with CORNER-GROUNDED DELTA-INPUTMechanical Specification UPS SpecificationsGeneral Specification Terms Specification RemarksNominal Capacity 150 kW 225 kW 300 kW Electrical Specification Do not open the front coverOperator Interface UPS may not respond if the button press is too shortKey-Switch and Buttons Graphic Display Panel KEY-SWITCH/OPERATING Buttons13.2 LCD/LED Indicators Graphic Display Panel LCD/LED IndicatorsLCD Indicators Name DescriptionVolt Freq .0Hz Normal DisplayAC-VO AC- I O 50% 50%DC-V BATT-V BATT- I 0A AC I/P-V Freq .0HzBYP I/P-V Freq .0Hz 32TIMFault Display 09-09-06LCD Scroll AbbreveationsEPO and Control Power Supply Operating Switches Operating the UPSPre-operational Check Operation TypesPerform the pre-operational check before operating the UPS Startup Procedures Procedure to start the UPS is shown in StepsAC Vo 480 AC Io 50% Switch Power Supply UPS→Bypass Bypass LED is onStop Complete Shutdown DC-V 0 BATT-V 0 BATT-I 0 aChanging Between Float Charge and Equalize Charge Make sure that the Float Charge LED is onMake sure that the Equal Charge LED is on Emergency Power Off EPO TroubleshootingTypes of Errors Faults and Warnings Data Screen 09-09-06LCD Fault & Warning Displays Fault DisplayFault Messages LCD Message Indication DescriptionLCD Message Indication Description LCD Scroll w/ faults or warnings ResetDo not attempt to modify or relocate the UPS Contact Toshiba in the event of malfunction or faultRestoring UPS Operation Do not open the front and/or rear panelsPage Page Industrial Division