Datalogic Scanning C-BOX 200 installation manual Power Supply, Power switch ON/OFF positions

Page 16

DATALOGIC

C-BOX 200

2.4.1 Power Supply

Power is supplied to the C-BOX 200 through the pins provided on the spring clamp connector.

The power switch (see Figure 2.6) switches the power supply ON or OFF for both the C-BOX 200 and the connected scanner.

S1

ON

OFF

Figure 2.6 - Power switch ON/OFF positions

C-BOX

1 VS

2 GND

USER INTERFACE

V+ (10 - 30 Vdc)

GND

Figure 2.7 - Power supply connections

NOTE

Pin 1 is also electrically connected to pins 3 and 5, just as pin 2 is electrically connected to pins 4 and 6. This is useful for external trigger/inputs connections.

The power supply must be between 10 and 30 Vdc only.

Installation - 7

Image 16
Contents BOX Installation Manual BOX821000560 Contents Guide to Installation General View Figure aFigure B Safety Precautions Power SupplyViii General Features DescriptionInstallation Package ContentsOpening the Device Opening the C-BOXMechanical Installation Overall dimensionsMounting C-BOX Electrical Connections and Setup System layoutPower Supply Power switch ON/OFF positionsSystem Wiring System cable connectionsRefer to the scanner Installation Manual for details Chassis Grounding Jumper Settings Chassis grounding10 Rotary switches Multidrop Address Selection11 Termination resistance switch 5 RS485 Bus TerminationConnection to a Multiplexer BOX7 OM4000 Jumper Settings 13 OM4000 jumpers14 9-pin male connector Pin connector pinout Name Function 9-PIN Scanner Auxiliary Serial InterfaceScanner Requirements Operating Modes1 GET/SEND Buttons GET SendLED Indicators 15 LED IndicatorsTechnical Features Environmental Features