DATALOGIC |
2.4.2 System Wiring
The connection and wiring procedure for
1)Open the
2)Verify that the
3)Unscrew the compression connectors and pass all the system cables through them into the
4)To connect the power and input/output signals:
•Prepare the individual wires of the system cables by stripping the insulation back approximately 1 cm.
•Using a device such as a screwdriver, push down on the lever directly next to the clamp (see Figure 2.8).
•Insert the wire into the clamp and release the lever.
The wire will now be held in the spring clamp.
Figure 2.8 - System cable connections
The wiring used can be solid or stranded but must meet the following specifications.
All positions: | 24 - 16 AWG | 0.2 - 1.5 mm² |
8 - Installation