Datalogic Scanning
C-BOX 200
installation manual
Box, Installation Manual
Install
LED Indicators
System Wiring
Dimension
7 OM4000 Jumper Settings
Safety Precautions
Power Supply
General Features
Rotary switches
Page 2
C-BOX
200
INSTALLATION MANUAL
Page 1
Page 3
Image 2
Page 1
Page 3
Contents
BOX
Installation Manual
BOX
821000560
Contents
Guide to Installation
General View
Figure a
Figure B
Safety Precautions
Power Supply
Viii
General Features
Description
Installation
Package Contents
Opening the Device
Opening the C-BOX
Mechanical Installation
Overall dimensions
Mounting C-BOX
Electrical Connections and Setup
System layout
Power Supply
Power switch ON/OFF positions
System Wiring
System cable connections
Refer to the scanner Installation Manual for details
Chassis Grounding Jumper Settings
Chassis grounding
10 Rotary switches
Multidrop Address Selection
11 Termination resistance switch
5 RS485 Bus Termination
Connection to a Multiplexer
BOX
7 OM4000 Jumper Settings
13 OM4000 jumpers
14 9-pin male connector Pin connector pinout Name Function
9-PIN Scanner Auxiliary Serial Interface
Scanner Requirements
Operating Modes
1 GET/SEND Buttons
GET Send
LED Indicators
15 LED Indicators
Technical Features
Environmental Features
Related pages
All Install page
Software Utilities Installation for Samsung 6100N
AInstall the wing needle for Brother NX 600
Installation Instructions for GE IM-5SS
Installing the Fryer for Frymaster KSCF18G
Installation for Samsung WW90M761NOA/KJ
Over de installatie en de instellingen for Pioneer PDP-S63
50BVW,X Field-installed Low Voltage Schematic for Carrier 50XJ064-104
Precautions D’INSTALLATION for Denon DRA-295
Install Setback Control for Bradford-White Corp 238-47878-00B 04/10
Försiktighetsmeddelanden VAR Försiktig FÖR Installation for Samsung RF24HSESCSR/EE
What should I do if I need assistance with Heatcraft parts?
Contact support
Top
Page
Image
Contents