Allied Telesis AT-iMG646PX-ON, AT-EN646 manual 1188

Page 41

AT-iMG646xx Series Intelligent Multiservice Gateway and AT-EN646 Enclosure Installation Guide

4.Insert a UV-rated wire tie (not provided) through the slots at the bottom of the entrance as shown in Figure 8.

844

Figure 14. Inserting the Wire Tie

5.Remove the grommet from the fiber optic drop cable and ground wire entrance.

6.Open the shielding to 1.5 in. beyond the grommet slot where the cable will be coming into the enclosure, per the cable manufacturer’s instructions, exposing 41 in. (104.14 cm) of buffer tube.

7.Open out the shielding to expose the buffer tube, as shown in Figure 15.

1188

Figure 15. Opening Out the Shielding

8.Locate the drop cable clamp on the grounding plate (see Figure 5 on page 35) and remove the Kepnuts, washers, and bar from the posts.

9.Locate the strength member clamp (see Figure 5 on page 35) on the grounding plate and remove the Kepnuts and bar.

Section I: Outdoor Installation

41

Image 41
Contents Installation Guide Page Electrical Safety and Emissions Standards Translated Safety Statements Contents Section II Indoor Installation Figures Connecting the Management Cable Tables Tables Preface Symbol Meaning Description Safety Symbols Used in this DocumentWhere to Find Web-based Guides Contacting Allied Telesis WarrantyManagement Software Updates Preface Chapter OverviewFeatures Page 878 LED LEDsState Description Section Outdoor InstallationSection I Outdoor Installation Outdoor Installation Overview Illustrates the AT-EN646 enclosure EnclosureInstallation Options Outdoor Installation Overview Section II Indoor Installation Installing the Enclosure Reviewing Safety Precautions Section I Outdoor Installation Tools Additional Supplies Required Tools and SuppliesMounting Hole Locations Mounting the EnclosureInstalling the Enclosure Installing the Grounding Plate Installing Dielectric Drop Cable Installing the Fiber Optic Drop CablePositioning the Cable Installing the Ground Wire Securing the Tracer Wire and Aramid Yarn Installing Armored Drop Cable 1188 Armored Drop Cable Secured to the Grounding Plate 1196 Splicing the Drop Cable and Securing the Fusion Splice Tray Using the Two Part Metal Splice TraySecuring the Buffer Tube Installing the Enclosure 854 Using the Plastic Splice Tray 1182 1184 Installing the Gateway Outdoors Reviewing Safety Precautions Section I Outdoor Installation Required Tools and Supplies Installing Gateway Enclosure Installing the GatewayPositioning the Gateway on the Mounting Post Mounting the Gateway Preparing Connecting Power Cord Proper Installation of the Terminal Block Ground Wire Mounting the Splice Tray on the Gateway Connecting the Fiber Optic Cable Connecting the Telephone Wires Connecting the LAN Cables Inserting the Wire Tie Completing the Installation Installing the Gateway Outdoors Indoor Installation Section II Indoor Installation Installing the Gateway Indoors Installing the Gateway Indoors Section II Indoor Installation Required Tools and Supplies Preparing for the Installation Securing the Plywood to the Wall Securing the Grounding Stud Securing the Gateway to the Mounting Surface Connecting the Ground Wire Preparing and Connecting the Power Cord 1305 Plugging in the DC Terminal Block Connecting the Fiber Optic Cable Connecting the Fiber Optic CableConnecting the Telephone Wires Connecting the Telephone WiresConnecting the LAN Cables Connecting the LAN CablesCompleting the Installation Troubleshooting Section III Troubleshooting Section I Troubleshooting Troubleshooting Technical Specifications Power Cord Wiring Appendix B Cleaning Fiber Optic ConnectorsRubbing the Ferrule Tip on the Cleaning Surface Using a Cartridge-Type CleanerPage Cleaning a Recessed Ferrule If desired, repeat step Using a SwabPage Appendix B Cleaning Fiber Optic Connectors Appendix C Turnup ProcessTurnup Flowchart