3.Connect the LAN cables to the
Completing the Installation
864
Figure 44. Connecting the LAN Cables
4.Cut a notch into the bottom of the grommet to accommodate the LAN cables and reinsert the grommet.
5.Trim the wire tie and seal the grommet with tape and silicone sealant.
To complete the installation, perform the following procedure:
1.Install an uninterruptible power supply according to the manufacturer’s instructions.
2.Plug the power cable from the gateway into the UPS.
3.Turn on the UPS.
4.If necessary, plug the management cable into the console port, as shown in Figure 45.
865
Figure 45. Connecting the Management Cable
Section I: Outdoor Installation | 65 |