Allied Telesis AT-EN646, AT-iMG646PX-ON manual Completing the Installation

Page 84

Chapter 5: Installing the Gateway Indoors

Completing the Installation

To complete the installation, perform the following procedure:

1.Install an uninterruptible power supply according to the manufacturer’s instructions.

2.Plug the power cable from the gateway into the UPS.

3.Turn on the UPS.

4.If necessary, plug the management cable into the console port, as shown in Figure 56.

1193

Figure 56. Connecting the Management Cable

Note

For networks with remote management enabled, no local configuration is required.

5.Configure the AT-iMG646xx series intelligent multiservice gateway according to your specifications and then unplug the management cable.

6.Ensure that all provisioned services are functioning properly.

84

Section II: Indoor Installation

Image 84
Contents Installation Guide Page Electrical Safety and Emissions Standards Translated Safety Statements Contents Section II Indoor Installation Figures Connecting the Management Cable Tables Tables Preface Safety Symbols Used in this Document Symbol Meaning DescriptionWhere to Find Web-based Guides Warranty Contacting Allied TelesisManagement Software Updates Preface Overview ChapterFeatures Page 878 LEDs LEDState Description Outdoor Installation SectionSection I Outdoor Installation Outdoor Installation Overview Enclosure Illustrates the AT-EN646 enclosureInstallation Options Outdoor Installation Overview Section II Indoor Installation Installing the Enclosure Reviewing Safety Precautions Section I Outdoor Installation Required Tools and Supplies Tools Additional SuppliesMounting the Enclosure Mounting Hole LocationsInstalling the Enclosure Installing the Grounding Plate Installing the Fiber Optic Drop Cable Installing Dielectric Drop CablePositioning the Cable Installing the Ground Wire Securing the Tracer Wire and Aramid Yarn Installing Armored Drop Cable 1188 Armored Drop Cable Secured to the Grounding Plate 1196 Using the Two Part Metal Splice Tray Splicing the Drop Cable and Securing the Fusion Splice TraySecuring the Buffer Tube Installing the Enclosure 854 Using the Plastic Splice Tray 1182 1184 Installing the Gateway Outdoors Reviewing Safety Precautions Section I Outdoor Installation Required Tools and Supplies Installing the Gateway Installing Gateway EnclosurePositioning the Gateway on the Mounting Post Mounting the Gateway Preparing Connecting Power Cord Proper Installation of the Terminal Block Ground Wire Mounting the Splice Tray on the Gateway Connecting the Fiber Optic Cable Connecting the Telephone Wires Connecting the LAN Cables Inserting the Wire Tie Completing the Installation Installing the Gateway Outdoors Indoor Installation Section II Indoor Installation Installing the Gateway Indoors Installing the Gateway Indoors Section II Indoor Installation Required Tools and Supplies Preparing for the Installation Securing the Plywood to the Wall Securing the Grounding Stud Securing the Gateway to the Mounting Surface Connecting the Ground Wire Preparing and Connecting the Power Cord 1305 Plugging in the DC Terminal Block Connecting the Fiber Optic Cable Connecting the Fiber Optic CableConnecting the Telephone Wires Connecting the Telephone WiresConnecting the LAN Cables Connecting the LAN CablesCompleting the Installation Troubleshooting Section III Troubleshooting Section I Troubleshooting Troubleshooting Technical Specifications Power Cord Wiring Cleaning Fiber Optic Connectors Appendix BUsing a Cartridge-Type Cleaner Rubbing the Ferrule Tip on the Cleaning SurfacePage Using a Swab Cleaning a Recessed Ferrule If desired, repeat stepPage Appendix B Cleaning Fiber Optic Connectors Turnup Process Appendix CTurnup Flowchart