Contents |
|
Preparing and Connecting the Power Cord | 58 |
Mounting the Splice Tray on the Gateway | 60 |
Connecting the Fiber Optic Cable | 61 |
Connecting the Telephone Wires | 62 |
Connecting the LAN Cables | 63 |
Completing the Installation | 65 |
Section II: Indoor Installation | 67 |
Chapter 5: Installing the Gateway Indoors | 69 |
Reviewing Safety Precautions | 70 |
Required Tools and Supplies | 72 |
Tools | 72 |
Additional Supplies | 72 |
Preparing for the Installation | 73 |
Fastening the Plywood Mounting Surface to a Wall and Preparing the Gateway | 74 |
Connecting the Ground Wire | 77 |
Preparing and Connecting the Power Cord | 78 |
Connecting the Fiber Optic Cable | 81 |
Connecting the Telephone Wires | 82 |
Connecting the LAN Cables | 83 |
Completing the Installation | 84 |
Section III: Troubleshooting | 85 |
Chapter 7: Troubleshooting | 87 |
Appendix A: Technical Specifications | 89 |
Physical Specifications | 89 |
Environmental Specifications | 89 |
Power Specifications | 89 |
Safety and Electromagnetic Emissions Certifications | 89 |
Power Cord Wiring | 90 |
Appendix B: Cleaning Fiber Optic Connectors | 91 |
Using a | 92 |
Using a Swab | 94 |
Appendix C: Turnup Process | 97 |
Turnup Flowchart | 98 |
6