Allied Telesis AT-iMG646PX-ON, AT-EN646 Proper Installation of the Terminal Block Ground Wire

Page 59

AT-iMG646xx Series Intelligent Multiservice Gateway and AT-EN646 Enclosure Installation Guide

Caution

To prevent electrical shock, ensure that the power cord is not connected to the UPS.

4.Cut a piece of insulated #18 AWG stranded wire to 5-1/2 to 6 in. (140 - 150 mm) long. The insulation color should be green with yellow stripes.

5.Strip 1/4 in. (6 mm) of insulation from both ends.

6.Slide a #10 ring lug with a green insulation jacket onto one end of the wire and double crimp.

7.Twist the strands on the other end of the wire into a tight bundle.

Caution

To prevent shorting out the unit, ensure that all of the wire strands are twisted tightly together.

8.Remove the Kepnut from the ground wire post, place the ring lug on the post, and secure the Kepnut.

9.Loosen the screw for pin 5 on the DC terminal block.

10.Insert the ground wire into pin 5 alongside the black wire under the pin and tighten the screw.

The proper installation of the terminal block ground wire is shown in Figure 35.

1304

Figure 35. Proper Installation of the Terminal Block Ground Wire

Section I: Outdoor Installation

59

Image 59
Contents Installation Guide Page Electrical Safety and Emissions Standards Translated Safety Statements Contents Section II Indoor Installation Figures Connecting the Management Cable Tables Tables Preface Symbol Meaning Description Safety Symbols Used in this DocumentWhere to Find Web-based Guides Contacting Allied Telesis WarrantyManagement Software Updates Preface Chapter OverviewFeatures Page 878 LED LEDsState Description Section Outdoor InstallationSection I Outdoor Installation Outdoor Installation Overview Illustrates the AT-EN646 enclosure EnclosureInstallation Options Outdoor Installation Overview Section II Indoor Installation Installing the Enclosure Reviewing Safety Precautions Section I Outdoor Installation Tools Additional Supplies Required Tools and SuppliesMounting Hole Locations Mounting the EnclosureInstalling the Enclosure Installing the Grounding Plate Installing Dielectric Drop Cable Installing the Fiber Optic Drop CablePositioning the Cable Installing the Ground Wire Securing the Tracer Wire and Aramid Yarn Installing Armored Drop Cable 1188 Armored Drop Cable Secured to the Grounding Plate 1196 Splicing the Drop Cable and Securing the Fusion Splice Tray Using the Two Part Metal Splice TraySecuring the Buffer Tube Installing the Enclosure 854 Using the Plastic Splice Tray 1182 1184 Installing the Gateway Outdoors Reviewing Safety Precautions Section I Outdoor Installation Required Tools and Supplies Installing Gateway Enclosure Installing the Gateway Positioning the Gateway on the Mounting Post Mounting the Gateway Preparing Connecting Power Cord Proper Installation of the Terminal Block Ground Wire Mounting the Splice Tray on the Gateway Connecting the Fiber Optic Cable Connecting the Telephone Wires Connecting the LAN Cables Inserting the Wire Tie Completing the Installation Installing the Gateway Outdoors Indoor Installation Section II Indoor Installation Installing the Gateway Indoors Installing the Gateway Indoors Section II Indoor Installation Required Tools and Supplies Preparing for the Installation Securing the Plywood to the Wall Securing the Grounding Stud Securing the Gateway to the Mounting Surface Connecting the Ground Wire Preparing and Connecting the Power Cord 1305 Plugging in the DC Terminal Block Connecting the Fiber Optic Cable Connecting the Fiber Optic CableConnecting the Telephone Wires Connecting the Telephone WiresConnecting the LAN Cables Connecting the LAN CablesCompleting the Installation Troubleshooting Section III Troubleshooting Section I Troubleshooting Troubleshooting Technical Specifications Power Cord Wiring Appendix B Cleaning Fiber Optic ConnectorsRubbing the Ferrule Tip on the Cleaning Surface Using a Cartridge-Type CleanerPage Cleaning a Recessed Ferrule If desired, repeat step Using a SwabPage Appendix B Cleaning Fiber Optic Connectors Appendix C Turnup ProcessTurnup Flowchart