NEC MA4000 manual Outdoor Spaces, Removing a Telecommunication Space, Adding an Outdoor Space

Page 41

Setting Up Infrastructures

4-7

Removing a Telecommunication Space

Step 1 On the Cable Management Main Page, select Infrastructure on the SETUP menu.

Step 2 Highlight the floor name or icon where the space is housed.

Step 3 In the grid, click the space you wish to remove and click the Delete button. If there is termination hardware associated with the floor, a Cable Management warning box pops up: "The selected termination room has termination hardware associated with it. It cannot be deleted until all subordinate items are removed."

Step 4 Click Save to complete the deletion. The space's name will be removed from the Navigator Tree.

Outdoor Spaces

Each campus you set up will have a number of spaces that house components of the infrastructure. Cable Management lets you designate building space and outdoor space.

Building space can include cubicles, rooms, termination rooms, closets, and any space defined in your facility. You can also set up an outdoor space such as a manhole or a utility pole. After spaces are in place you can start to specify cabling and hardware.

An outdoor space, such as a manhole or utility pole, is added at the campus level in the Navigator Tree.

Adding an Outdoor Space

Step 1 On the Cable Management Main Page, select Infrastructure on the SETUP menu.

Step 2 Highlight the campus where you wish to add an outdoor space.

Step 3 The Campus Info screen appears with the campus name in the title bar and in the Attributes frame. Click the Space List radio button, and then the Add button. Enter the name of the space.

Step 4 The Space Type column must be populated with the Telecommunication Space designation. Select the TR Type from the drop-down list.

Step 5 Click Save when you are finished.

Step 6 A plus sign appears next to the campus icon indicating that there is infrastructure information at the next level down. Click plus (+) changing it to a minus (-)to expand and view that information. A pole icon appears next to the name of each outdoor space.

MA4000 Expense Management Cable Management User Guide - Issue 1

Image 41
Contents MA4000 Expense Management NEC Infrontia Corporation Liability DisclaimerContents Setting Up Infrastructures Figures Page How This Guide is Organized IntroductionCable Management Main Exploring Cable ManagementExploring the Cable Management Environment Cable Management Main Menu Hierarchy Descriptions Cable Management EnvironmentNavigator Tree Location Info List View Button Detail View Viewing an Attachment AttachmentsAdding an Attachment Adding additional Notes to the Port or Strand Level Deleting an AttachmentAdding Notes Revision Log Deleting NotesPage Multi-View Multi-Task Capability Cable Management Tools Available Within the ApplicationSearch Function Using the search functionWindow Sizing View Most Recently Added Items Quick Set/Quick Insert ButtonsCopy Capabilities Copy ButtonUsing the copy to Excel Using the Copy functionTo Excel Button To Clipboard ButtonTo access the Circuit Trace Tool Accessing the Circuit Trace ToolCircuit Trace Tool About the Circuit Trace ToolViewing Circuit Information Show/Hide Table or DiagramInvert Table Copy to ClipboardViewing a Components Detail Arranging the DiagramViewing a components Details View information Changing the Trace PointUser Defined Fields Creating customized fields Custom FieldsViewing the Security Log Security LogGeneral Settings Page About Cable Managements Wizards Cable Management WizardsUsing an infrastructure setup wizard Infrastructure Setup WizardsSome examples are listed below Documentation WizardsCan still rename any port individually Port Naming WizardAbout the Infrastructure Setting up the Geographical InfrastructureTo set up a Company Setting Up CompaniesSetting Up Infrastructure within a Company Campuses Adding a Campus BuildingsRemove a Campus Adding a BuildingAdding a Floor FloorsRemoving a Building Adding an Indoor Space Indoor SpacesRemoving a Floor Adding a Telecommunication Space Telecommunication SpacesRemoving an Indoor Space Adding an Outdoor Space Outdoor SpacesRemoving a Telecommunication Space Removing an Outdoor Space FaceplatesAdding a Faceplate Removing a FaceplateRemoving a Port PortsAdding a Port Adding Termination Hardware Setting Up the Cabling InfrastructureTermination Hardware Editing Port/Position Status Defining Termination HardwareStart and End Port/Position Assets Workstation Assets Backbone AssetsAdding a Backbone Asset Adding a Workstation AssetHorizontal Links FinancialsDefining Horizontal Links Setting up a horizontal linkHorizontal Link HL Info Connecting a Data Horizontal Link to a Backbone Asset Connecting Contacts to a Horizontal LinkConnecting Workstation Assets to a Horizontal Link Connecting a Voice Horizontal Link to a Backbone Asset Connecting a Data Horizontal Link to a Mainframe AssetConnecting a Horizontal Link to Termination Hardware Identifying Horizontal Link Pathways UsedSplices Connecting a Horizontal Link to a Grounding ConductorEditing the Key Sheet Adding SplicesBackbone Cables Connecting a Backbone Cable to a SpliceBackbones Adding a Backbone Setting up a backbone typeDefining a Backbone Deleting a Backbone typeSetting up the backbone source Setting up the backbone destinationBackbone Source Backbone SourceChanging the status of a port Backbone Pair/Strand DetailsBackbone Cross-Connects Identifying Backbone Pathways UsedGrounding Connecting a Backbone to a Grounding ConductorAdding pathways used Adding BusbarsAdding a Conductor Conductor Pathways Used FirestopsAdding a Firestop Adding firestops in your infrastructureConnecting a Pathway to a Firestop Connecting a Firestop to a PathwayPathways Adding a PathwayConnecting to another pathway Connecting the PathwaysContacts Adding a contactDefining a Contact Connecting a User to Horizontal LinksDefine a contact type Deleting a contact typeReports How to Run a ReportCreating Cable Management Specific Users Generating a report from the Report CreatorSorting, Filtering, and Grouping Reports Available Reports Print Details ButtonLaunching the Spreadsheet Tool Spreadsheet ToolSpreadsheet Tool Import from Excel About the Spreadsheet ToolAdding data to the Import Tool Using the Import Tool to Transfer Data to Cable ManagementChecking Data Importing Data Page Firestops Termination HardwareCross-Connects Splices GroundingPathways Ability to see backbone pair/strand details/statusPage MA4000 Expense Management Cable Management User Guide
Related manuals
Manual 280 pages 30.63 Kb