NEC MA4000 Quick Set/Quick Insert Buttons, View Most Recently Added Items, Copy Capabilities

Page 21

Cable Management Tools

2-3

Quick Set/Quick Insert Buttons

Throughout Cable Management where you choose a location for a component or, in the Cable Path, where you insert a component, you will find shortcut buttons (Quick Set and Quick Insert) that allow you to quickly choose a location.

When you click on the Quick Set or Quick Insert button, the Navigator Tree is highlighted (its background turns blue), and you can simply click on the location on the tree to incorporate the information for that location into the component's detail record.

View Most Recently Added Items

Many fields in the Detail View in Cable Management have a Recent button next to them. When you place your cursor over this button, a floating window will appear that displays the following:

The 10 most recently modified items in that component category, and the date each was modified.

The 10 most recently added items in that component category, and the date each was modified.

This information is particularly helpful when adding or modifying component information.

Copy Capabilities

Cable Management provides several options for copying existing data to other locations in Cable Management or to entirely separate applications, such as Microsoft Excel and Word. These copy capabilities are always available in the List View pane and can be used by clicking on any of these three buttons:

Copy

To Excel

To Clipboard

Copy Button

Cable Management's Copy capability is a great time saver available throughout the application. This feature is always located in the List View pane and can be used by clicking on the Copy button. If used properly it will minimize typing time and user errors. The Copy capability allows a selected item to be completely copied into the Detail View area, where you can then modify any information. This is especially helpful for creating new components that closely resemble already-built components.

MA4000 Expense Management Cable Management User Guide - Issue 1

Image 21
Contents MA4000 Expense Management NEC Infrontia Corporation Liability DisclaimerContents Setting Up Infrastructures Figures Page How This Guide is Organized IntroductionExploring Cable Management Exploring the Cable Management EnvironmentCable Management Main Cable Management Main Menu Cable Management Environment Navigator TreeHierarchy Descriptions Location Info List View Button Detail View Attachments Adding an AttachmentViewing an Attachment Deleting an Attachment Adding NotesAdding additional Notes to the Port or Strand Level Revision Log Deleting NotesPage Multi-View Multi-Task Capability Cable Management Tools Available Within the ApplicationUsing the search function Window SizingSearch Function View Most Recently Added Items Quick Set/Quick Insert ButtonsCopy Capabilities Copy ButtonUsing the copy to Excel Using the Copy functionTo Excel Button To Clipboard ButtonTo access the Circuit Trace Tool Accessing the Circuit Trace ToolCircuit Trace Tool About the Circuit Trace ToolViewing Circuit Information Show/Hide Table or DiagramInvert Table Copy to ClipboardViewing a Components Detail Arranging the DiagramViewing a components Details View information Changing the Trace PointUser Defined Fields Creating customized fields Custom FieldsViewing the Security Log Security LogGeneral Settings Page About Cable Managements Wizards Cable Management WizardsUsing an infrastructure setup wizard Infrastructure Setup WizardsSome examples are listed below Documentation WizardsCan still rename any port individually Port Naming WizardAbout the Infrastructure Setting up the Geographical InfrastructureSetting Up Companies Setting Up Infrastructure within a Company CampusesTo set up a Company Adding a Campus BuildingsRemove a Campus Adding a BuildingFloors Removing a BuildingAdding a Floor Indoor Spaces Removing a FloorAdding an Indoor Space Telecommunication Spaces Removing an Indoor SpaceAdding a Telecommunication Space Outdoor Spaces Removing a Telecommunication SpaceAdding an Outdoor Space Removing an Outdoor Space FaceplatesAdding a Faceplate Removing a FaceplatePorts Adding a PortRemoving a Port Setting Up the Cabling Infrastructure Termination HardwareAdding Termination Hardware Defining Termination Hardware Start and End Port/PositionEditing Port/Position Status Assets Workstation Assets Backbone AssetsAdding a Backbone Asset Adding a Workstation AssetHorizontal Links FinancialsSetting up a horizontal link Horizontal Link HL InfoDefining Horizontal Links Connecting Contacts to a Horizontal Link Connecting Workstation Assets to a Horizontal LinkConnecting a Data Horizontal Link to a Backbone Asset Connecting a Voice Horizontal Link to a Backbone Asset Connecting a Data Horizontal Link to a Mainframe AssetConnecting a Horizontal Link to Termination Hardware Identifying Horizontal Link Pathways UsedSplices Connecting a Horizontal Link to a Grounding ConductorEditing the Key Sheet Adding SplicesConnecting a Backbone Cable to a Splice BackbonesBackbone Cables Adding a Backbone Setting up a backbone typeDefining a Backbone Deleting a Backbone typeSetting up the backbone source Setting up the backbone destinationBackbone Source Backbone SourceChanging the status of a port Backbone Pair/Strand DetailsBackbone Cross-Connects Identifying Backbone Pathways UsedGrounding Connecting a Backbone to a Grounding ConductorAdding pathways used Adding BusbarsAdding a Conductor Conductor Pathways Used FirestopsAdding a Firestop Adding firestops in your infrastructureConnecting a Pathway to a Firestop Connecting a Firestop to a PathwayPathways Adding a PathwayConnecting to another pathway Connecting the PathwaysContacts Adding a contactDefining a Contact Connecting a User to Horizontal LinksDefine a contact type Deleting a contact typeReports How to Run a ReportCreating Cable Management Specific Users Generating a report from the Report CreatorSorting, Filtering, and Grouping Reports Available Reports Print Details ButtonLaunching the Spreadsheet Tool Spreadsheet ToolSpreadsheet Tool Import from Excel About the Spreadsheet ToolAdding data to the Import Tool Using the Import Tool to Transfer Data to Cable ManagementChecking Data Importing Data Page Termination Hardware Cross-ConnectsFirestops Splices GroundingPathways Ability to see backbone pair/strand details/statusPage MA4000 Expense Management Cable Management User Guide
Related manuals
Manual 280 pages 30.63 Kb