Linear SLD, SLR, SLC manual Gate Bracket and Chain Assembly, END of Gate Pipe Shown Reference only

Page 6

Gate Bracket and Chain Assembly

NOTE: The item numbers shown in these illustrations are for reference only. For the actual part numbers, refer to the parts lists in the rear of this manual.

Assemble a gate bracket (1) to the front edge of the gate, using two U-bolts (2), and mounting hardware (3).. Before tightening down completely, be sure the bracket is parallel to the gate.. Tighten the U-bolt hardware the rest of the way, then screw the square head bolts (4) into the threaded holes in the gate plate until they bottom out against the gate.. These will help keep the bracket from twisting on the pipe..

Slide a threaded chain pin (5) through the bracket as shown, with spring (6), flat washer (10), and two hex nuts (7).. Attach one end of the drive chain (8) to the chain pin using master link (9) and begin unrolling the chain toward the operator.. An optional Tail Mount configuration is shown in Figure 4B..

Remove the rain cover from the back of the slide gate operator.. Carefully thread the drive chain under the first idler, over the drive sprocket, and then under the last idler.. Make sure you feed most of the chain through the idlers and sprocket before attaching the chain to the back end of the gate..

Assemble the other gate bracket on the rear edge of the gate, using the same process as the front gate bracket.. Once this is done, take the other chain pin, spring and jam nuts and assemble with the end of drive chain and the other master link..

At this point you should be able to adjust the chain tension by tightening the jam nuts on each end.. Approximately 1/4” to 3/8” of slack per foot of drive chain is acceptable. Make sure the chain does not drag on the ground, across the gate rollers or the idler frame of the operator..

Additional mounting holes have been provided in the gate bracket for installer convenience..

8

9

5

6 7 10

Figure 3. Chain Pin and Chain Assembly

DRIVE SPROCKET

 

IDLER WHEEL

IDLER WHEEL

 

 

CHAIN

DRIVE

 

PATH

SPROCKET

 

CHAIN

IDLER

 

PATH

WHEEL

NOTE: IDLER CONFIGURATION

 

MAY APPEAR DIFFERENT DEPENDING

 

ON THE SLIDE OPERATOR MODEL

 

Figure 4A. Chain Path

END OF GATE PIPE SHOWN

REFERENCE ONLY

1

2

4

3

Figure 2. Mounting Gate Bracket to Gate

 

DRIVE

 

DRIVE

 

 

SPROCKET

 

SPROCKET

 

 

 

 

 

 

CHAIN

IDLER

CHAIN

IDLER

PATH

 

WHEEL

PATH

WHEEL

 

 

NOTE: IDLER CONFIGURATION

MAY APPEAR DIFFERENT DEPENDING

ON THE SLIDE GATE INSTALLATION

Figure 4B. Tail Mount Chain Path

SLR SLC SLD  Slide Gate Operator Installation Guide

- 4 -

227968 Revision X13 2-3-09

Image 6
Contents SLR SLC SLD Table of Contents Regulatory Warnings Before You BeginAlways Check the Gate’s Action Gate Operator ClassificationsWiring Specifications AC Power WiringDC Control and Accessory Wiring Gate Preparation Mounting Pad InstallationMounting Pad Specifications Gate PostGate Bracket and Chain Assembly END of Gate Pipe Shown Reference onlyOperator Setup Operator PreparationLimit Nuts Rough Adjustment Limit Nuts Fine AdjustmentRIGHT-HAND Installation Controller Features ConnectorsIndicator Descriptions Blinks if Connection has Failed Maint Alert SETTerminal Descriptions Terminal Group FunctionOperator Accessory Connections Operator Accessory ConnectionsBasic Controller Programming Run Alarm and Pre-start Alarm Maximum Open Direction Current SettingMaximum Close Direction Current Setting Advanced Controller Programming Entering Advanced Programming ModeSingle Button Input Setup Maximum Run TimeLow Power Mode Auxiliary Relay ModeReverse Delay Time Power Failure ModeSoft Start/Stop Duration Reset Cycle CountMaintenance Alert Trigger Mid-travel Stop PositionReset Controller to Factory Defaults Radio EnableAntenna Installation Radio Transmitter LearnUSE Relief Cuts AT Corners Loop Layout IllustrationLoop Sealant SLR SLC SLD Safety Edge Layout Illustration Safety Edge Layout Illustration #2 Photoeye Installation Illustration Pickets Space Smaller than 2 1/4 Entrapment Zone #3Entrapment Zone #1 Track Gate Installation Gate Bracket Bolted to ChannelOperator #1 Dual Gate InstallationsOpen and Close Limit settings ShieldGate Operation Operation IndicationsComm Link Connection Failure Error IndicationsEntrapment MGT Obstacle Transmitter TroubleTroubleshooting Model SLR Exploded View Optional PartsModel SLC Exploded View Optional Torque LimiterFor drives 34 to 47 feet wide CapacitorsModel SLD Exploded View LimiterModel SLD Mechanical Parts List DC Motor Brush Replacement Model SLD MaintenanceBattery Maintenance When NEWFCC Notice Preventative MaintenanceMonth Preventative Maintenance GeneralGate Operator Installation Checklist Installer Customer