Life Fitness SM40 manual LOW ROW Cable Routing, Adjustable crossover cable end detail

Page 13

SM40 Unpacking & Assembly Instructions

Figure 15. Adjustable crossover cable end detail.

Using a 7/8” wrench, tighten the jam nut onto the adjustable pulley threads as shown in Figure 15. Place a rubber cap on the top of the cable as shown in Figure 15 (right).

LOW ROW CABLE ROUTING

Route the low row cables as shown in Figure 16.

Figure 16. Low row cable routing.

13

Image 13
Contents Stack MULTI-JUNGLE SM40 Unpacking and Assembly Instructions Assembly Time Materials and Tools Required for AssemblyUnpacking Parts box contentsPlace the weight cube in its final resting spot AssemblyConfiguration for 2-3/4 and 3 bolts Mount lat top V, tricep top U, adjustable crossover top Install the weight stacks. To do this Bolt the floating pulleys into the 190 lb weight stacks Mount the benches to the frame Bolt the benches to the frame Removing the pulley bolts Installing the CablesAdjustable crossover cable routing Adjustable Crossover Cable RoutingLOW ROW Cable Routing Adjustable crossover cable end detailLAT Pulldown Cable Routing Screw the cable into the weight stackTricep pushdown cable routing Tricep Pushdown Cable RoutingHardware Hardware . Assembly PartsHardware . Rubber caps Hardware . Cables Hardware . Cable jam nutHardware . Top assemblies Hardware . Floating pulley Hardware . Weight stack rubber bumpersParts List Hardware installed InstalledPulley hardware Floating pulley