Life Fitness SM40 manual Install the weight stacks. To do this

Page 7

SM40 Unpacking & Assembly Instructions

4.Install the weight stacks. To do this:

A.Using a 9/16” socket and combination wrench, remove the tricep back rest bolts (see Figure 10).

B.Using a 9/16” socket and combination wrench, unbolt the top plate and remove the guide rods (see Figure 10).

Figure 7. Remove the tricep back rest, the top plate and the guide rods.

C.Prepare the weight stack. Slide the guide rods (2) through the weight stacks (1) as shown below. Place rubber bumpers (3) on the bottoms of each guide rod. Make sure the pull pin (4) is in the bottom weight plate.

D.Flip over the weight stacks. When shipped, the weight stacks have the pull pins facing upward. You will need to flip the stacks over so that the pull pins are facing outward when they are loaded onto the machine. Since the pull pins will be facing downward when they are flipped over, it is recommended that you put the stacks on a padded carpet to keep the pins from being damaged.

E.Set the weight stacks onto the machine. Using a piano dolly, lift the weight stacks over the bottom plate and set the stacks onto the rubber bumpers with the plate numbers facing outward. The 300 lb weight stacks need to be facing the “sides” of the cells (where the benches will be attached- see Figure 6). The 190 lb weight stacks will need to be facing the “outsides” and “insides” of the cells (where the tricep pulley and adjustable pulley will be attached- see Figure 6). Make sure the pull pins are facing outward.

C. Prepare the weight stack- add bumpers to bottom, insert guide rods, put pull pin in bottom stack.

D. Flip over the weight stack

onto piano dolly.E. Hoist the weight stack onto the machine.

7

Image 7
Contents Stack MULTI-JUNGLE SM40 Unpacking and Assembly Instructions Assembly Time Materials and Tools Required for AssemblyUnpacking Parts box contentsPlace the weight cube in its final resting spot AssemblyConfiguration for 2-3/4 and 3 bolts Mount lat top V, tricep top U, adjustable crossover top Install the weight stacks. To do this Bolt the floating pulleys into the 190 lb weight stacks Mount the benches to the frame Bolt the benches to the frame Removing the pulley bolts Installing the CablesAdjustable crossover cable routing Adjustable Crossover Cable RoutingLOW ROW Cable Routing Adjustable crossover cable end detailLAT Pulldown Cable Routing Screw the cable into the weight stackTricep pushdown cable routing Tricep Pushdown Cable RoutingHardware Hardware . Assembly PartsHardware . Rubber caps Hardware . Cables Hardware . Cable jam nutHardware . Top assemblies Hardware . Floating pulley Hardware . Weight stack rubber bumpersParts List Floating pulley InstalledHardware installed Pulley hardware