Life Fitness SM40 manual Materials and Tools Required for Assembly, Assembly Time

Page 2

SM40 Unpacking & Assembly Instructions

The SM40 comes partially assembled. Follow the steps below to complete the assembly.

WARNING: COMPONENTS OF THE SM40 ARE LARGE AND HEAVY. USE CAUTION WHEN ASSEMBLING THIS MACHINE.

MATERIALS AND TOOLS REQUIRED FOR ASSEMBLY

1/2”, 3/8”, 5/8” & 9/16”

1/8”

5/8” & 9/16”

Pinch bar

Socket wrench with

hex key wrench

Combination wrench

 

extension

 

 

 

You will also need a piano dolly to lift and position the weight stacks and a ladder.

ASSEMBLY TIME

Two people can accomplish this assembly in approximately 1 hour.

2

Image 2
Contents Stack MULTI-JUNGLE SM40 Unpacking and Assembly Instructions Materials and Tools Required for Assembly Assembly TimeParts box contents UnpackingAssembly Place the weight cube in its final resting spotConfiguration for 2-3/4 and 3 bolts Mount lat top V, tricep top U, adjustable crossover top Install the weight stacks. To do this Bolt the floating pulleys into the 190 lb weight stacks Mount the benches to the frame Bolt the benches to the frame Installing the Cables Removing the pulley boltsAdjustable Crossover Cable Routing Adjustable crossover cable routingAdjustable crossover cable end detail LOW ROW Cable RoutingScrew the cable into the weight stack LAT Pulldown Cable RoutingTricep Pushdown Cable Routing Tricep pushdown cable routingHardware . Assembly Parts HardwareHardware . Rubber caps Hardware . Cable jam nut Hardware . CablesHardware . Top assemblies Hardware . Weight stack rubber bumpers Hardware . Floating pulleyParts List Pulley hardware InstalledHardware installed Floating pulley