Life Fitness SM40 manual Pulley hardware, Installed, Floating pulley, Hardware installed

Page 22

SM40 Unpacking & Assembly Instructions

 

Pulley hardware

0017-00101-1413

(installed)

1-3/4” Bolt

0017-00104-0368

Cap washer

0017-00103-0217

3/8” Nyloc nut

 

Floating pulley

0017-00101-1413

hardware (installed)

1-3/4” Bolt

0017-00104-0313

Flat washer

0017-00103-0217

3/8” Nyloc nut

22

Image 22
Contents Stack MULTI-JUNGLE SM40 Unpacking and Assembly Instructions Materials and Tools Required for Assembly Assembly TimeParts box contents UnpackingAssembly Place the weight cube in its final resting spotConfiguration for 2-3/4 and 3 bolts Mount lat top V, tricep top U, adjustable crossover top Install the weight stacks. To do this Bolt the floating pulleys into the 190 lb weight stacks Mount the benches to the frame Bolt the benches to the frame Installing the Cables Removing the pulley boltsAdjustable Crossover Cable Routing Adjustable crossover cable routingAdjustable crossover cable end detail LOW ROW Cable RoutingScrew the cable into the weight stack LAT Pulldown Cable RoutingTricep Pushdown Cable Routing Tricep pushdown cable routingHardware . Assembly Parts HardwareHardware . Rubber caps Hardware . Cable jam nut Hardware . CablesHardware . Top assemblies Hardware . Weight stack rubber bumpers Hardware . Floating pulleyParts List Pulley hardware InstalledHardware installed Floating pulley