Life Fitness SM40 manual Unpacking, Parts box contents

Page 3

SM40 Unpacking & Assembly Instructions

UNPACKING

Follow the steps below when unpacking the components of the SM40.

1.Cut off the shipping wrapper.

2.Remove the parts box and shipping boards.

3.Remove the items in the parts box. These items are shown in Figure 1.

A.Remove the bolts bag.

B.Remove the parts shown below. Parts that are used to build the SM40 are described in the section HARDWARE at the end of these instructions.

Figure 1. Parts box contents.

3

Image 3
Contents Stack MULTI-JUNGLE SM40 Unpacking and Assembly Instructions Assembly Time Materials and Tools Required for AssemblyUnpacking Parts box contentsPlace the weight cube in its final resting spot AssemblyConfiguration for 2-3/4 and 3 bolts Mount lat top V, tricep top U, adjustable crossover top Install the weight stacks. To do this Bolt the floating pulleys into the 190 lb weight stacks Mount the benches to the frame Bolt the benches to the frame Removing the pulley bolts Installing the CablesAdjustable crossover cable routing Adjustable Crossover Cable RoutingLOW ROW Cable Routing Adjustable crossover cable end detailLAT Pulldown Cable Routing Screw the cable into the weight stackTricep pushdown cable routing Tricep Pushdown Cable RoutingHardware Hardware . Assembly PartsHardware . Rubber caps Hardware . Cables Hardware . Cable jam nutHardware . Top assemblies Hardware . Floating pulley Hardware . Weight stack rubber bumpersParts List Floating pulley InstalledHardware installed Pulley hardware