Life Fitness SM40 manual Bolt the floating pulleys into the 190 lb weight stacks

Page 8

SM40 Unpacking & Assembly Instructions

F.With the top plate on the guide rods, bolt on the top plate to the top of the cells as shown in Figure 8 using a 9/16” socket and combination wrench and the 3” bolts (with cap washers) that were previously inserted.

Figure 8. Bolt on the top plate.

5.Bolt the floating pulley into the 190 lb weight stack using a 7/8” combination wrench (NOT for the tricep pushdown weight stack- the one with the tricep back rest mounted to the frame as shown in Figure 7). You will need to remove the pulley from the housing to thread the plug into the weight stack bayonet. Make sure the 9/16” jam nut is threaded 1- 5/8” away from the pulley as shown in Figure 9. Leave the pulleys out since you will need to have them out when the cable is routed.

Figure 9. Bolt the floating pulleys into the 190 lb weight stacks.

8

Image 8
Contents Stack MULTI-JUNGLE SM40 Unpacking and Assembly Instructions Materials and Tools Required for Assembly Assembly TimeParts box contents UnpackingAssembly Place the weight cube in its final resting spotConfiguration for 2-3/4 and 3 bolts Mount lat top V, tricep top U, adjustable crossover top Install the weight stacks. To do this Bolt the floating pulleys into the 190 lb weight stacks Mount the benches to the frame Bolt the benches to the frame Installing the Cables Removing the pulley boltsAdjustable Crossover Cable Routing Adjustable crossover cable routingAdjustable crossover cable end detail LOW ROW Cable RoutingScrew the cable into the weight stack LAT Pulldown Cable RoutingTricep Pushdown Cable Routing Tricep pushdown cable routingHardware . Assembly Parts HardwareHardware . Rubber caps Hardware . Cable jam nut Hardware . CablesHardware . Top assemblies Hardware . Weight stack rubber bumpers Hardware . Floating pulleyParts List Installed Hardware installedPulley hardware Floating pulley