28.Wrap the Lat Cable (49) around a 90mm Pulley (48) and route the Cable down through the Top Frame (4). Attach the Pulley inside the Top Frame with an M10 x 80mm Bolt (84), two M10 Washers (80), two 19mm Spacers (67), and an M10 Nylon Locknut (77).
29.Set an M12 Large Washer (98) on top of the Weight Tube (20). Thread the M12 Nut (112) all the way onto the Lat Cable (49).
Thread the Lat Cable (49) into the Weight Tube (20) two turns. Tighten the M12 Nut (112) against the M12 Large Washer (98).
30.Identify the Leg Lever Cable (51). Route the Cable through the Leg Lever (12) and the Front Leg (10).
Insert a 90mm Pulley (48) into the Leg Lever (12) from behind as shown. Attach the Pulley with an M10 x 65mm Bolt (85), two M10 Washers (80), two 13mm Steel Spacers (109), and an M10 Nylon Locknut (77).
28 |
|
|
| 84 | 48 |
| 80 67 | |
|
| 67 |
|
| 80 |
| 49 | 77 |
| 4 |
|
29 |
|
|
| 49 |
|
| 112 |
|
| 98 |
|
|
| 20 |
30 |
|
|
| 12 |
|
85 | 48 |
|
80 |
| |
|
| |
51 | 109 |
|
|
| |
| 10 |
|
| 109 |
|
| 80 77 |
18