Spalding M88724C1 Attach backboard 13 to upper and lower, Yokes 18, Hardware as shown in FIG. D

Page 14

12.

Attach backboard (13) to upper and lower

 

yokes (18 & 17).

A.

First attach board (13) to upper yoke (17),

 

using TWO people to hold the board and

 

ONE person to attach hardware (FIG. A).

 

Use hardware as shown in FIG. B.

 

 

B.

 

Then, hinge board to match up with holes in

 

lower yoke (18), FIG. C, and secure with

 

hardware as shown in FIG. D.

 

 

WARNING!

THREE CAPABLE ADULTS REQUIRED FOR THIS PROCEDURE. FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS INJURY AND/OR PROPERTY DAMAGE.

FIG. A

 

FIG. B

 

 

 

13

 

 

 

 

 

 

 

34

21

21

22

21

21

34

 

 

 

22

 

 

 

 

 

 

 

 

FIG. C

FIG. D

 

13

34

21

21

22

21

21

34

 

 

 

22

 

 

 

 

 

 

 

 

ID# M88724C1

08/06

14

Image 14
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Side View Build drainage hillPlaying Surface Insert bushings 19 into areas ShownPlaying Surface Mounting plate 2 as shownCompleted Assembly While still in forward position, attach both upper Lower yokes 17 & 18 to pole as shownAttach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Yokes 18 Using TWO people to hold the boardAttach backboard 13 to upper and lower First attach board 13 to upper yokeShown Figure a Install net 4 to rim as shown Apply height indicator labels 32 & 31 to height indicatorsAttach height indicators Screws 29 into place with a Phillips head screwdriverNing After pole has been secured to anchor plate 2 loosen nut Remove cotter pin 9, and pull out pin 8. This will allowAfter system is leveled, completely tighten all nuts Check system leveling. PoleShould be level in all directions Limited Lifetime Warranty