Spalding M88724C1 manual Check system leveling. Pole, Should be level in all directions

Page 19

18.

Check system leveling. Pole (1)

 

should be level in all directions.

After system is leveled, completely tighten all nuts (25).

1

25

NOTE:

If adjustment is necessary, adjust system by rotating the nuts (25) between anchor plate (2) and pole flange.

2

19. Apply height adjust ment label (11).

Adjust system by turning crank until desired height is reached per height indicator (30).

WARNING!

30

 

10 feet

(3.05 m)

READ AND UNDERSTAND

WARNING & HEIGHT

ADJUSTMENT LABELS

BEFORE USING THIS UNIT.

FAILURE TO FOLLOW

OPERATING INSTRUCTIONS

COULD RESULT IN INJURY

OR DAMAGE TO PROPERTY.

11

12

19

08/06

ID# M88724C1

Image 19
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Build drainage hill Side ViewPlaying Surface Shown Insert bushings 19 into areasMounting plate 2 as shown Playing SurfaceCompleted Assembly Lower yokes 17 & 18 to pole as shown While still in forward position, attach both upperLower yoke Attach elevator adjustment 12 toAttach elevator adjustment 12 to pole bracket First attach board 13 to upper yoke Using TWO people to hold the boardAttach backboard 13 to upper and lower Yokes 18Shown Figure a Screws 29 into place with a Phillips head screwdriver Apply height indicator labels 32 & 31 to height indicatorsAttach height indicators Install net 4 to rim as shownNing Remove cotter pin 9, and pull out pin 8. This will allow After pole has been secured to anchor plate 2 loosen nutShould be level in all directions Check system leveling. PoleAfter system is leveled, completely tighten all nuts Limited Lifetime Warranty