Spalding M88724C1 manual Ning

Page 17

16.

WARNING!

THREE CAPABLE ADULTS REQUIRED FOR THIS

PROCEDURE. TWO PEOPLE ARE REQUIRED TO

GUIDE AND SUPPORT THE SYSTEM WHILE THE

THIRD PERSON IS TIGHTENING NUT (26) TO

RAISE THE SYSTEM UPRIGHT.

FAILURE TO FOLLOW THIS WARNING COULD

RESULT IN SERIOUS INJURY AND/OR

PROPERTY DAMAGE.

Upright pole (1) by tightening nut (26). Using 15/16” wrench, turn nut (26) clockwise to begin standing pole upright. Continue to turn nut (26) until pole has come to rest against washers (24) and pole is vertical.

Once pole is in its final position, install washers (24) and nuts (25) onto mounting bolts (19) and fully tighten to secure pole to anchor plate (2).

1

WARNING!

WAR

NING

1

26

24

24

2

7

THREE CAPABLE ADULTS REQUIRED FOR THIS PROCEDURE. FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS INJURY AND/OR PROPERTY DAMAGE.

25

24

PLAYINGSURFACE

17

08/06

ID# M88724C1

Image 17
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Build drainage hill Side ViewPlaying Surface Shown Insert bushings 19 into areasMounting plate 2 as shown Playing SurfaceCompleted Assembly Lower yokes 17 & 18 to pole as shown While still in forward position, attach both upperLower yoke Attach elevator adjustment 12 toAttach elevator adjustment 12 to pole bracket Attach backboard 13 to upper and lower Using TWO people to hold the boardYokes 18 First attach board 13 to upper yokeShown Figure a Attach height indicators Apply height indicator labels 32 & 31 to height indicatorsInstall net 4 to rim as shown Screws 29 into place with a Phillips head screwdriverNing Remove cotter pin 9, and pull out pin 8. This will allow After pole has been secured to anchor plate 2 loosen nutAfter system is leveled, completely tighten all nuts Check system leveling. PoleShould be level in all directions Limited Lifetime Warranty