Spalding M88724C1 manual Side View, Build drainage hill

Page 6

3.

Fill hole with concrete. Tamp down concrete to release air pockets

 

and build drainage hill.

DRAINAGE HILL

1" (2.54 cm)

PLAYING SURFACE

SIDEVIEW

4. Insert rebar (10) through holes in ground tube assembly (2) as shown.

2

10

10

10

ID# M88724C1

08/06

6

Image 6
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Side View Build drainage hillPlaying Surface Insert bushings 19 into areas ShownPlaying Surface Mounting plate 2 as shownCompleted Assembly While still in forward position, attach both upper Lower yokes 17 & 18 to pole as shownAttach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Yokes 18 Using TWO people to hold the boardAttach backboard 13 to upper and lower First attach board 13 to upper yokeShown Figure a Install net 4 to rim as shown Apply height indicator labels 32 & 31 to height indicatorsAttach height indicators Screws 29 into place with a Phillips head screwdriverNing After pole has been secured to anchor plate 2 loosen nut Remove cotter pin 9, and pull out pin 8. This will allowCheck system leveling. Pole Should be level in all directionsAfter system is leveled, completely tighten all nuts Limited Lifetime Warranty