3. | Fill hole with concrete. Tamp down concrete to release air pockets |
| and build drainage hill. |
DRAINAGE HILL
1" (2.54 cm)
PLAYING SURFACE
SIDEVIEW
4. Insert rebar (10) through holes in ground tube assembly (2) as shown.
2
10
10
10
ID# M88724C1 | 08/06 | 6 |