Spalding M88724C1 manual Limited Lifetime Warranty

Page 20

LIMITED LIFETIME WARRANTY

Subject to proper installation and normal use, Spalding® warrants, subject to limitations below, to the original retail

purchaser all structural components of the Spalding®

system to be free of defects in material and workmanship

for the duration of ownership by the original retail

purchaser.

Merchandise must be shipped prepaid with a copy of proof of purchase to our factory for examination to see whether

it needs to be repaired or replaced. Any labor costs, travel expenses and any other charges involved in the removal, installation or replacement of the defective/repaired parts from/to your Spalding® system will be your (the purchaser’s) responsibility. Shipping charges for replaced or warranted merchandise being sent back to the customer from our factory must be prepaid by the customer in advance. If not, the replacement shipment will be sent out collect.

What is Not Covered By This Warranty

Paint or rusted parts. Paint kits will be available to assist in normal maintenance.

RIM

HANGING ON THE RIM WILL VOID YOUR WARRANTY.

Rims are not warranted for any defects other than workmanship. Torn back plates, damaged springs, bent

rings, damaged eye bolts, and torn or distorted rim supports result from hanging on the rim and are not warranted.

ID# M88724C1

08/06

20

Image 20
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Side View Build drainage hillPlaying Surface Insert bushings 19 into areas ShownPlaying Surface Mounting plate 2 as shownCompleted Assembly While still in forward position, attach both upper Lower yokes 17 & 18 to pole as shownAttach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Using TWO people to hold the board Attach backboard 13 to upper and lowerYokes 18 First attach board 13 to upper yokeShown Figure a Apply height indicator labels 32 & 31 to height indicators Attach height indicatorsInstall net 4 to rim as shown Screws 29 into place with a Phillips head screwdriverNing After pole has been secured to anchor plate 2 loosen nut Remove cotter pin 9, and pull out pin 8. This will allowAfter system is leveled, completely tighten all nuts Check system leveling. PoleShould be level in all directions Limited Lifetime Warranty