Spalding M88724C1 manual Playing Surface, Mounting plate 2 as shown

Page 9

7A.

Rest top of pole (1) on a piece of scrap wood (not included) and line up holes in pole to holes in

 

mounting plate (2) as shown.

WARNING!

THREE CAPABLE ADULTS REQUIRED FOR THIS PROCEDURE. FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS INJURY AND/OR PROPERTY DAMAGE.

2

1

PLAYING SURFACE

SCRAP WOOD

(NOT INCLUDED)

1

PLAYING SURFACE

7B.

Insert bolt (28) through holes in plate and pole and secure with nut (22).

1

28

22

9

08/06

ID# M88724C1

Image 9
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Build drainage hill Side ViewPlaying Surface Shown Insert bushings 19 into areasMounting plate 2 as shown Playing SurfaceCompleted Assembly Lower yokes 17 & 18 to pole as shown While still in forward position, attach both upperLower yoke Attach elevator adjustment 12 toAttach elevator adjustment 12 to pole bracket Attach backboard 13 to upper and lower Using TWO people to hold the boardYokes 18 First attach board 13 to upper yokeShown Figure a Attach height indicators Apply height indicator labels 32 & 31 to height indicatorsInstall net 4 to rim as shown Screws 29 into place with a Phillips head screwdriverNing Remove cotter pin 9, and pull out pin 8. This will allow After pole has been secured to anchor plate 2 loosen nutCheck system leveling. Pole Should be level in all directionsAfter system is leveled, completely tighten all nuts Limited Lifetime Warranty