Spalding M88724C1 manual Attach elevator adjustment 12 to, Lower yoke

Page 12

10.

Attach elevator adjustment (12) to

lower yoke (18).

 

WARNING!

THREE CAPABLE ADULTS

REQUIRED FOR THIS

PROCEDURE. FAILURE

TO FOLLOW THIS

WARNING COULD RESULT

IN SERIOUS INJURY

AND/OR PROPERTY

DAMAGE.

18

22

21

19

12

20

21

19

ID# M88724C1

08/06

12

Image 12
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Side View Build drainage hillPlaying Surface Insert bushings 19 into areas ShownPlaying Surface Mounting plate 2 as shownCompleted Assembly While still in forward position, attach both upper Lower yokes 17 & 18 to pole as shownAttach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Using TWO people to hold the board Attach backboard 13 to upper and lowerYokes 18 First attach board 13 to upper yokeShown Figure a Apply height indicator labels 32 & 31 to height indicators Attach height indicatorsInstall net 4 to rim as shown Screws 29 into place with a Phillips head screwdriverNing After pole has been secured to anchor plate 2 loosen nut Remove cotter pin 9, and pull out pin 8. This will allowCheck system leveling. Pole Should be level in all directionsAfter system is leveled, completely tighten all nuts Limited Lifetime Warranty