Spalding M88724C1 manual Insert bushings 19 into areas, Shown

Page 8

6.

 

Insert bushings (19) into areas

 

shown.

 

 

13

19

19

19

19 19

19

19

19

19

17

19

19

19

19

1

19

19

19

19

18

19

19

19

ID# M88724C1

08/06

8

Image 8
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Side View Build drainage hillPlaying Surface Insert bushings 19 into areas ShownPlaying Surface Mounting plate 2 as shownCompleted Assembly While still in forward position, attach both upper Lower yokes 17 & 18 to pole as shownAttach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Using TWO people to hold the board Attach backboard 13 to upper and lowerYokes 18 First attach board 13 to upper yokeShown Figure a Apply height indicator labels 32 & 31 to height indicators Attach height indicatorsInstall net 4 to rim as shown Screws 29 into place with a Phillips head screwdriverNing After pole has been secured to anchor plate 2 loosen nut Remove cotter pin 9, and pull out pin 8. This will allowAfter system is leveled, completely tighten all nuts Check system leveling. PoleShould be level in all directions Limited Lifetime Warranty